Deck stairs
Decking was replaced with Trex composite. Rail posts were moved from outside deck floor joists to inside. This altered the location of the posts at the top if the stairs.
Daughter's house. Son-in-law wants the top stair to be level with the deck, but I don't think it should be because of the location of the top rail post which will be the top post of the stair railing. Because the railing will start its decline BEFORE the stairs, this would require someone like me, over 6-ft tall, to have to lean forward to grab the railing while making that first step down--not a good idea to have to lean forward while descending a staircase IMO.
Any suggestions as to how best do this?
He wants to replace all the stringers. The bottom is rotted, but could easily be repaired w/o replacing them IMO. My thought is to just cut one rise off the stringers (the rotted bottom rise), move them closer to the deck, and go with that.
Also trying to think of a way to make a more finished appearance to the edges of the composite decking, to hide the corrugated bottoms.
And is putting narrow concrete blocks under the bottom of the stringers an effective way to keep them from wicking water from the concrete pad so they won't be so prone to rotting? This is in Washington state, where it rains a lot. Like everyday, although it has been nice since I've been here.






