Bill Houghton, Sebastopol, CA
The risers are often rather thin stock, and not fastened in a way that would support a vertical load well. I'd consider resting a support on the second from top step (where your platform starts). However, you might toe-screw through the risers into the stringers to hold them in place. That way, when you remove the platform, the holes you need to repair will be vertical, rather than on the steps, and less prone to welcoming rot into the stair assembly; pressure-treated lumber is, really, treated only for the first fraction of an inch, and holes that penetrate through to the untreated wood encourage rot. You can get some pretty nifty screws at your hardware store. Don't use the cheap #6 deck screws; they're pretty brittle. Step up to the slightly more expensive #9 or #10 screws, which, in addition to being thicker, seem to be tempered better for strength (GRK is, in my limited experience, The Brand To Get, but other brands will work; just that the GRKs drive more easily).
We have finally come to recognize in our family that "temporary" means "probably no more than ten years," and I tend to build even the temporary stuff as well as I can. So remember to treat the cuts on your wood, particularly the cuts on the underside of the ramp's supports where they touch the ground.
Attaching the top of your ramp: bolt (3/8" or lags if the framing doesn't lend itself to bolts) a ledger to the uprights on your platform framing just below where the ramp stringers will hit, then toe-screw the stringers to the ledger. You should notch the tops of the stringers such that they sit flat on this ledger. Arrange your platform framing so that there's an upright behind each stringer, and toe-screw the stringers into the uprights as well. If you REALLY want to go first cabin, drill down through the stringers for counterbored lag screws into the ledger, and add a pressure block between the stringers - a 2x4 cut to fit moderately tightly between the stringers, and screwed to both; this will fight against any tendency of the stringers to fall over.
As to getting the angles, I think I'd do it one of two ways: 1) set up the stringer stock with appropriate blocking (really thick shims, in other words) so the top surface parallels what you want in your final layout and then figure out how wide a piece of plywood will equal what you have to remove to get to your final layout. Set this next to the stringers at the top and bottom and use it to draw your layout lines. 2) Same as step one, but guess at an angle, cut it wide of the final line, then repeat step 1 but with thinner shims. I'd probably do #2 if I were doing it.
Fasten the feet of your stringers to the ground somehow. You don't need to worry about uplift too much, but you do want to discourage any tendency to lateral movement.
If you're using 2x stock for the treads on your ramp, use three stringers if the ramp's wider than 36"; if 1x stock, three stringers regardless.
Make sure your platform is laterally braced, especially to resist pressure from the ramp, which will try to knock it over. 1x6 boards from the top of the framing near the ramp to the bottom of the framing opposite should do it; ideal construction would run similar boards back in the other direction, too.
Think long and hard about the uprights for the railing on the ramp; they tend to want to fall over. If you're bolting them to the stringers, put pressure blocks right next to the fastening to tie the stringers together, and arrange your bolts so you can tighten them again later. I think it's still current code that the railing be 36" to 39" above the ramp at any point, measured vertically.
Incidentally, your stairs violate current code in California and probably elsewhere (I think California uses one of the national codes in this area), which (the code) calls for a three foot by three foot landing outside any door before the stairs/ramps start. This is a safety thing, separating the act of getting outside and shutting the door (or opening to go in) from the act of going up and down. If you own the house, you might consider whether your ramp idea is a good one in the long term, too, for the landing as much as for the ramp.
Oh, final thought that I wish someone had said to me at various times when I was building steps (never tried a ramp): remember that your treads have thickness, and allow for this in layout of the ramp stringers.