Concrete Counter Update
Jennifer Indy.USA
Hey Gang,
We�re slowly making progress on our concrete counter top. Everybody in our house has been sick for what seems like weeks so it came to a grinding halt for a few of those. Anyway, we�re back up and running and have things moving in the shop again. We made several test samples and discovered that the Rock Hard Putty we are using to fill the corners and make the edges slightly rounded over was sucking all the water out of the concrete leaving the edges very crumbly and not what we want the finished counter to look like. So we made several more test sample and found that if we seal the Rock Hard Putty with a sealer of polyurethane it takes care of that problem. Yay! I�ve included the first pictures I posted plus a few more new ones. What you see is the cut out where the sink will go and then on the short side of the sink there is a piece of stone that Clay has ground smooth and is set in that brace thing. The brace is holding it up so that it stays at an angle when the concrete is poured. The smooth side is down because that will be the upside when we flip it over. The smooth stone will serve as a built in drain board that will overhang and drain into the sink. The sink is an under counter stainless single tub. It�s really deep. Uninstalled it looks more like a bath tub! On the other side of the sink you see the same stone as the drain board that have been cut and glued to the form in the swirl pattern that will end up at the edge of the sink. Remember everything is upside down and backwards so what you are looking at is the bottom of the countertop. It will end up flipped over and the face of the swirled stones and the drainboard facing down now will be exposed on the finished counter. We�ll install a combination of rebar and smaller wire in the form before pouring the concrete. We�ll mix up outside in a portable mixer that we have and then pour inside the shop where it will cure for a few weeks. We�ll then remove the form and take the counter outside where we will wet diamond polish and prep it for installation. All of the cabinets that will hold it up are done, the new sink, faucet and water filter are waiting patiently in their boxes and I can hardly wait to get this thing done. I just hope it stays in one piece! I have full confidence that the job foreman has all that thought out and under control.
Jen



The thought of beating on nine feet of coutertop with rubber mallets is not something I'm looking forward to!



