Shop Update
john lucas
Sorry no photos. I've spent the last week working with my friend Les on installing all the wiring. Man it takes a lot of time to install 40 outlets. I still have 7 to install the receptacles and then we have to wire the box.
I had to stop and start framing in the windows which should be here Monday. Picked up the attic vents and will try to get those installed in the next few days. Once I get all that done I have to install the ceiling. John K Jordan loaned me a panel lift so that job shouldn't be very difficult. Then I can call the insulation guys and get that sprayed in. Once that's done I can put up the walls and paint and then I'll be ready to move in. Of course I'll still have to run the dust collection and aircompressor lines but I think I'm finally getting there.
Oh yea I've got to change all the locks and get them keyed the same as well as put in metal anti theft barriers in the doors.
I took today off and went to an art show. I needed a break. It was a low end show so there wasn't much of interest. Tomorrow I have to pull out my mini lathe which fortunately I put in the mobil attic last. I have to turn a project for the Bring back for our Cookeville club. Fortunately I have enough tools that were left out for my demos to allow me to turn something. Don't know if I can find my sandpaper so I may have to turn it so I can start with 400 grit and got to the automotive store and get a few sheets of 400 and 600.