workshop rebuild finally starting
john lucas
The guys working on my garage are finally getting to the last stages. They are at least to the point that I can start moving things out of the existing garage that will become my workshop.
I started working on the "workshop" that is attached to the existing garage. I ripped out all the old cabinets. I may keep the two in the photo and might redo the workbench and keep it. This room is 11x23 and will become my metal working building as well as my finishing and surface decoration room. I want to keep that room dust free. I'm going to build a down draft table to do a lot of the surface carving. The big dusty carving will be done in the attached garage which will become the main both areas will be heated with gas heat. Air conditioning will have to wait.
Hope to start on the electricity and insulation in a week or so. then things will really get moving.