Home Articles Forums Gallery Marketplace Videos

WoodCentral Forums

Knowledge You Can Build On — Est. 1998

THE WOODRAT IS BACK!

slowly getting it together

Posts

slowly getting it together

#1

slowly getting it together

John Lucas

things just don't go quickly in sparta. We've been in the house a month and just got our computers running yesterday. Still have very poor working cell phones but hope to have that remedied this week.

As far as the shop goes it's very frustrating. I thought I had the money for my dream shop. apparently that's going to run about 10 grand more than i have. I have called about 12 contractors. very few even called back even though they all took my name and said they would be in touch. The first 2 were fly by night. The second 2 gave very high costs. Haven't heard back from the 3rd. I had one come by yesterday. I gave him my max budget and downsized my plans for heating and cooling and no plumbing.

Worse case scenario I redo the existing garage and shop which I think will work but I will still need to build a garage first so that I can unload some of my equipement from the storage container to have tools to work with on the rebuilt shop. It all may work out but will be months before I get a working shop again. Very frustrating.

Re: slowly getting it together

#2

Amish Shed

Jeff Willaford

When we moved to our current location I had a prebuilt shed brought in for about $3K. That gave me a place to unpack tools and a small bit of a shop to work from. After I completed the house remodeling I then build a shed for garden tools, lawn mower and general wood storage. The original shed got itself converted to a shop (of sorts).

Maybe something like that could be a place to start quickly and actually add value later. Just a thought.

Re: slowly getting it together

#3

Re: Amish Shed

John Lucas

I'm looking at having a 2 car garage built of the actual build of the shop falls through. Trying to get estimates on that. We want a garage anyway and will use the existing garage if the shop comes through. If not a more inexpensive garage will work as a shop while I remodel the current buildings.

Re: slowly getting it together

#4

Re: Amish Shed

Stuart Johnson

John, Have you looked into a metal building? Have the basic building built and then finish it as you are able. Spec out all the rough in stuff prior to having the slab poured.

Re: slowly getting it together

#5

Re: Amish Shed

John Lucas

stuart that is one option offered by my latest contractor. The problem is the building itself will be expensive enough that I'm not sure I can afford to finish off the inside. At least not when you include some sort of heaters and interior walls.

gonna try and contact an electrician to see how much it will cost to get a wire and box to the older garage. I have a friend who will help me wire it from there. so turning that building into the shop may be the most affordable option.