projects in the works
John Lucas
I'm almost done with the flower pot addition to a piano stool. A friend wanted this piano stool converted onto a flower pot so I build the 16 sided fluted mahagony pot for the top half. I've got 2 layers of stain on it. I think the color will be just about perfect when I get the finish on. The test sample looks extremely close. I'll put some finish on this tomorrow and see how close it is.
There's a couple of bowls in the foreground. One will get some pyro work on it. I had to repair a stool base for my sister. That's done now also.
I think my feet are warm enough to get back to work. I'm redoing my dust collector hook ups. It's always been really jury rigged and I decided it's time to fix it up. I bought the 50ft length of hose from PennstateInd. It's not very good quality but the price was right and it will last until I get the addition built onto my garage this spring and install the newer Grizzly 2300cfm I just bought. It won't even fit in my shop and I have to run a new 220 line to power it. I decided it was time for the addition and get my compressor installed out there also. It will be nice to get those out of the shop and sure can use the space. 



