Irene update
Mike Foster
Well I finally got up to the new clinic today. Found that there was actually 5 feet of water in the basement, not1-2. This submerged the clinic's suction, compressor, furnace, water heater and server where all the patient files and information was stored. There are backups for all the data, but it will take a while to rebuild the whole system with the database once the hardware is installed. The breaker box was also about 2/3 submerged as well. While I was there, the maintainance supervisor showed up with the fire marshall. Fire marshall wants us to replace the breaker box and any wiring that was submerged (even though the power was back on on a couple of the circuits for pumps and dehumidifiers and fans). Looks like we're probably at least 2 weeks from being up and running. I think that is REALLY optimistic but we'll see. We were lucky in the clinic as we really just had water damage along with silt and debris left on the grounds. Here are a few shots of some of the damage that was done by the same river just a few miles downstream.
The hole in the road on the last shot would fit a football field and is at least 30 ft deep. Those are national guard trucks and equipment on the far side. They were trying to figure out how to make a route for cars around the hole.




