OT-Concrete Question

Posts

OT-Concrete Question

#1

OT-Concrete Question

BubbaBob

>OK...so I am cheap.

Now that that is out of the way, I need to know if short (18" or so) shop foundation walls can be poured in stages...form it up, then pour a bit at the time...a yard of leftovers from new house being built close by today, 3 bags of sacrete next weekend if I'm feeling energetic, etc.

Will each new pour adhere to the previous, or am I going to end up with as many separate pieces of concrete as I did separate pours?

I've done foundation work before, but always in one pour.

BubbaBob

Re: OT-Concrete Question

#2

Re: OT-Concrete Question

Dennis Bilevich PRESCOTT AZ

>Use a step @each joint with re bar and shoud be ok. DENNIS

Re: OT-Concrete Question

#3

Re: OT-Concrete Question

Dale Stansbery

>I use Mean Green on my band saw tires with good effect. It ought to work elsewhere as well.

Re: OT-Concrete Question

#4

Previous post shoulda been under Dick McNeils

Dale Stansbery

>question about green wood goop!

Re: OT-Concrete Question

#5

Re: OT-Concrete Question

JL work

>Put ties or rebar in between each joint. Abrade or rough the surface between each pour. You can use dilute muriatic (HCl) acid to give you a better bonding surface. I don't really recommend doing it that way though. A single pour gives you a much stronger, more intergral foundation unit. You are basically setting yourself up for a possibility of future cracks. Plan your work so that the cracks won't matter.

Re: OT-Concrete Question

#6

Re: OT-Concrete Question

woodspinner

>Bubba

Use lots of rebar, 3 horizontal runs, as it will hold the joints together. I would also angle the end of each pour so the next will sit on a portion of the prior pour. I would also make the corner pours in one piece.

Bill

Re: OT-Concrete Question

#7

Thanks folks

BubbaBob

>

Re: OT-Concrete Question

#8

I�d advise against it.

David Sophusson, Custer Wa.

>Hi Bubba,

There is no bond and no strength in a cold joint, you would be relying solely on the rebar. In my area for a proper foundation you have to pour a 6x12 inch footing 18 inches below ground level, deeper if you�re in a colder climate, with rebar and wire tied. Also you have to have 6 inches minim space between any building materials, such as sill plates and siding, and organic material such as soil and beauty bark if you plan to put flower beds around your building. I just looked at a house with an improper foundation, it was ugly! On one living room wall they built a proper brick fireplace on an approved footing. Then they bricked that entire wall around it. The house was built in �69 and now the foundation on that wall has sagged do to the weight of the brick more that four inches in one spot. The fireplace hasn�t moved an inch but the house is settling around it. They did use reinforced concrete in a single pour but just not enough so now if you sight down the top of the foundation it rises up and down like a lazy �S�, it would most certainly have been worse had they not done a single pour.

Another alternative for you maybe would be to pour a proper reinforced footing at code depth for your area then build up using cinder blocks for the rest of the foundation as you come across them. Some times they can be found for next to nothing or even free.

Sophie, who in a past life was a journeyman bricklayer but that was 30 years ago.