OT - bathroom remodel approaching done
Bill Houghton, Sebastopol, CA
In some ways, I didn't retire so much as change jobs; we've been fairly steadily marching through the house, dealing with years and years of accumulated maintenance. September 14 (2009, that is), we started the remodel of the second bathroom in the house. I last refreshed it, badly and with inadequate materials but all we could afford, in 1989. I knew, this time, that we were going to have to replace some rotted framing. What I didn't know was how much, or that we'd be replacing badly done foundation, too.

Every project we do blossoms into subsidiary projects (previous owners have been rather...creative...in their carpentry). This one included a complete roof tearoff, reframing, and reshingling across the additions on the back of the house. Naturally, this was the year that ended California's drought, with 4" of rain in half a day in mid-October, just as we were partway through that part. The picture below is AFTER the storm and after my son and I pulled tarps in the middle of the rain (sheet plastic is NOT adequate rain protection).

My wife's little clawfoot tub, in the other bathroom, is far too small for my 6+ feet of arthritis, so I had an outdoor shower next to the hot tub. Down to 32 degrees or so, this wasn't bad: a few minutes soak in the hot tub, and my core temperature was high enough to stay warm while I showered. During rainstorms and during the 22 degree cold snap we got somewhere in there, I just soaked in the tub.

We're not quite done yet, but the punchlist is getting short. I've been showering inside for over a week now, and let me just comment that civilization has its virtues (the bathroom door was off for painting when these were taken; it's now in place).


Hey, this multiple pictures in one post feature is terrific!