Stock prep???
HB
>I get my shop time an hour or two at a time, so I often completely dimension and prep my stock until I have a pile of prepped lumber ready for the joinery. Then I tackle the joinery and assembly. I haven't had any problems with the stock moving after prep until recently, but that may be due to the sall scale of my projects so the stuff hasn't sat very long before beig joined.
The last project I did gave me some problems though. It was a large picture frame and I prepped the rails and stiles for the frame and then left them sit for about a week before I got back to the project. One of the rails was a mess. All the wind I had taken out of it was back.....
I am wondering if I need to prep my stock only to rough dimensions and then try to finsh the dimensioning and joinery all in one shot?
How do the rest of you guys do it?
Thanks.
HB