Instinct...
mark hennebury
I am not an engineer, or anything else really, I have no training or certificates at all, consequently I go on instinct. That said, the fastening system that you have used just doesn't feel right to me. I understand that it has been designed by an engineer. tested and verified to far exceed code. I have no doubt that it does what you say it does. I don't like the concept. You have a long lever acting against screws. I also have doubts on the longevity of this design. I certainly wouldn't pay an engineering firm for coming up with it. The joint that I suggested, I have no such doubts or concerns. It is simple, incredibly strong, and will last as long as the bridge. I have no data to back that up, just a belief. You are more that welcome to make one a stress test it. As for construction, there are ways to do production efficiently. Could you get the post cut and drilled prior to arrival at the site? There are many portable power tools designed for timber notching. There are ways. I would choose the best joinery then figure out the most efficient way to do it. I of course work for myself so code is of no concern to me. I have been told that engineer's design jobs to just meet specs, and no more, yet you were able to reduce the fasteners and reduce the size while improving performance. If the engineers did their job, would that have been possible? I just don't like the concept.