Re: Slow move to new (old) condominium....
Jesper, Denmark
My new-to-me apartment is in a small complex with six apartments. Originally built in 1916 as a manufacturer's mansion in front and a three story leather factory in back. All brick and concrete construction with black glazed roof tiles.
My apartment is the second floor of the old factory, a very strange building design, 20x60 feet plan with a blank wall to the north, east and west and 9 identical windows to the south.
There are some dimensional challenges, which I had not thought of when I bought it, so some furniture has to be down-sized to fit where I had anticipated locating it.
The new elm work table was finished and installed this weekend. Not really furniture grade lumber, but not dull looking either. It is sized so that when put together with the modified dining table, form a 30" x 126" long table for the (infrequent) family parties.
Simple box joint oak boxes with french cleats were finished last week to serve as bedside tables - easy to clean under and matching the oak bed.
Next will be finishing the dining table and a long low bookshelf to serve as a TV stand and hopefully get movers to transport to couch and other furniture in the coming week.
.............stay tuned.

Each plank will need to be scribed to the plank next to it that has already been fitted, and then steamed and clamped in place, cooled, dried and removed, scribed to the seam batten on its other edge, and glued in place. Then the next plank needs to be rough shaped and scribed to that one and steamed. Timing and complexity constraints mean that there will be no need to steam more than one plank at a time, or probably even more than one plank a month. When I set it up for steaming chair parts, processing multiple parts simultaneously will become an important issue.