The glue up of this desk is the most stressful glue up I have ever accomplished. Scattered among the following description are some assembly tips others may find of use.

There are 28 mortise and tenon and 4 dovetail joints on fairly frail pieces that will not withstand excessive "coaxing" with a rubber mallet. When assembled the frame is self locked together by the dovetails in the top rails so the order of assembly was to be critical.
Because the pieces are less robust than say for a dining table the joinery must be as strong as possible so I chose to use yellow glue rather than the slower setting liquid hide glue I normally use for complex assemblies. Saving the day is the fact that "yellow" glue has little shear strength until it fully sets. Any joint that didn't come together by hand and gentle mallet tapping could later be pulled into submission by steady clamp pressure.

Step one in a successful glue up is planning. Here the parts and materials are laid out to avoid time-wasting confusion during assembly. The joints are prominently numbered and critical orientations indicated by arrows and text. Clamps are preadjusted and glue spreading devices-spatula and brush- ready. Adding to the stress is that I could not fully dry fit this desk, the reason being the top rail dovetails that lock it all together being too risky to disassemble. However, and this is most important, each joint was dry fit and adjusted so that it slid together by hand pressure only.

This final picture shows the joinery at one corner of the leg. The top rail is a dovetail into the leg. The panel is M&T into the leg as well as the top and bottom rails. The bottom rail is a double M&T into the leg. Below and out of the picture is a stretcher M&T into the shaped leg, a tedious joint to fit well.
The Lee Valley clamps I reviewed recently are best for a glue up like this one. This number of heavier clamps would likely distort the assembly.