Well we're in phase 4.2.7 of our kitchen remodel. Today was Sawz-All and demo day! The sink and cabinets under it have been torn out and now we just need to install the new ones that have been waiting in the wings. First we'll redo the existing plumbing to get that up to date and then the concrete counter top will span nearly the entire wall. It will go from the corner to just the edge of the window on the far left. The dishwasher will finally be in a proper cabinet and we'll be nearly done. Just the lower cabinets that will be full of deep drawers on the opposite side of the kitchen need to be built.
My new Dremel Multi tool sure did come in handy here.
Jackie Lynne was bored to tears today.
This old house sure does reveal a lot of history when you start peeling back the layers. We can now start to see the end of the tunnel. Yay!
I know what you mean about house history. Last summer I gutted our kitchen and bath down to the studs. Some of the things we found in the walls and under the linoleum were interesting. Like newspaper from the war years talking about "Yanks beat Nazis".
I don`t know about that Mackay, those valves are a lot better than the so called chrome plated ones. They are the ones that never work when they need to, at least in all the homes I worked in. I usually use full flow ball valves. Larry
If you have a good Plumber , you can get the drain back in the wall and under the Cabinet floor , sure saves a lot of cussing and gives the Cabinet interior a clean look and more functional use.
We had the same exact problem when we did our Kitchen over.
On any valve that sits un-moved for long periods, always start to close them a "hair" before leaving them in the on position. It takes the slop out of the mechanical train and will help to stop "lock up". Forty years of industrial maintenance with many emergency cut-offs...this was part of our "code".