Counter Top Poured!
Jennifer Indy.USA
Well the concrete is poured! We actually poured it on Wednesday after that nasty ice storm. Everything went perfectly. On Monday we picked up a pneumatic concrete vibrator from Ray Thompson and he had another little one that came out of a Lazy-Boy chair (that he found at a garage sale for .50 cents) so we borrowed that one too. Both worked like a charm. Thanks Ray! The day before, Clay measured out all of the ingredients and weighed them out exactly according to a concrete book that we have called �Concrete Countertops: Design, Form, and Finishes for the New Kitchen and Bath�. We used pea gravel, sand and Portland cement. We mixed outside the shop and then brought pails of it inside to the form. We mounted the pneumatic vibrator underneath the mold and occasionally moved it from end to end and to the middle of the form. The other little one that came out of the Lazy-Boy chair was electric and I just moved it around of the edges and underneath and inside the sink cut out. The bubbles worked their way out really well with these. Much better than any other method we had tried. So the counter top sits in the shop for probably a week and then we�ll take the form off and carefully turn it over. Let it sit for about 4 weeks to cure and then we�ll haul it outside for polishing with diamond grinder discs and water. The cabinets you see in the background are the ones that will hold this countertop up. We�ll be glad to have the shop back. This thing and the cabinets takes up a lot of real estate in there!
Thanks again Ray for the vibrators. They helped a ton!
Thanks for looking,
Jen