Concrete Countertop Pics
Jennifer Indy.USA
Well the kitchen remodel continues. We have about 45% of the cabinets done. We�re now working on the countertop that will surround the sink. The other side of the kitchen will be cherry countertops. This side will be cast concrete that we plan to add some inset stone in a pattern yet to be decided. We�ve been playing around with some designs and different layouts with a variety of stones that we�re cutting and shaping. I say we�but Clay is the one making this one happen. The concrete is cast upside down and backwards and my brain just doesn�t work that way. I�m not sure what that says about Clay
�.but I�m glad I don�t have to figure this out. As you look at the photographs the first one is just of the bench we had to build to hold the concrete mold. The second one shows the bottom of the mold which will actually be the topside of the countertop. The small trough on the right side is the back splash and then there is the filler (plug) for the sink. There will be a slab of smooth stone slanted inset into the concrete that slightly overhangs the undermount stainless sink that will act as a built in drain board. We�ve yet to turn some plugs for where the new faucet/spray and filtered water will go. The material for the form is �� melamine that is sanded out so there is no texture to it. The corners are filled and slightly rounded by finger with plumber�s putty. Some routing took care of the outside edge relief. When we�re ready we�ll set the stone patterns in with either super glue or thin double sided tape to hold them on the melamine enough to pour the concrete. We�ve done a couple of test pours and found that the thicker double sided tape that woodturner�s use is way too thick. There would be a ton of grinding involved afterwards. We�ve played around on the practice pours with some copper inlays too. This is a really fun project and I just wanted to share some progress shots. After we figure out the stone inlays and pattern we�ll install the rebar and pour some concrete! After that we wait�and wait�then pop it out and wait some more. Then grind and polish with a variety of diamond grinding pads in grits from 50-12000 or some crazy high number? We probably won�t be installing until well into January or even February. More pics to come as we move along on this one.
Jen

... ended up going with a composite material. I hope there are lots of strong WC'ers living nearby to help you guys flip that over 



