Workbench finally ready for work!
Stephen Kirk
OK, I need some dog holes and to put some finish on the top, but this big fella is together, in place, and already getting used. It was quite a bit of work. My sizes are a bit smaller than Bob Lang's plans, but I went TAP with the lumber I had (ash trees from my front yard). Trees had to come down (danger to the house), so the cost of the bench was around $200 to haul, cut and dry the lumber, than another $240 for the vise.
My trays are fairly level, but I do have to shim them a bit and things aren't perfect. I'll work on making them a bit better, but they work just fine right now. It is just a bench. I like that I can flip them over and make a flat surface. I will put holes in a few of them to hold planing stops or to work as tool holders. On the far right one, I hung my pencil sharpener. Just flip it over, sharpen, then back out of the way.
The twin screw is nice, but a bit tricky to attach. I followed Bob's plan and just glued the blocks under the bench that the screws run through. Seems plenty solid. I love the nearly 24" room between the screws, it'll hold nearly anything. It doesn't clamp super tight, though, so I think I'll add some leather to faces to increase the grip.
I'll start drilling some dog holes (do them by hand with bit/brace, heard that makes holdfasts work better). Then I just have to order some holdfasts from Joel.
I love the bench. Big, stable, feels like a rock. The ability to pop a tray out and clamp in the center is really nice. With tools in the trays, I can slide boards over top without knocking everything off.
Yeah, I decided it was time I got into one of my pics. Plus I had a few of my helpers around.
Now it's time to get back to some furniture! 



