I am remodeling a house. Tore out a ceramic tile floor to patch the rotted floor around the toilet. The floor now has 1/2" plywood over joists on 16" centers. Can I put one of the cement boards (Durock/Wonder Board) directly over that or do I have to put an additional layer of plywood? Or would you go back with 5/8 underlayment? We will be installing ceramic tile.
To my way of thinking the 1/2" plywood is too thin to support the backer board. I have used 2 layers of 1/2" plywood in the past under backer board myself without any problems.
I thought I heard/read somewhere that 1" is the minimum (combination of plywood and tile backer) to shoot for but I think 1 1/4" feels much more solid. It's relatively easy to craft any transition you might need due to height differences between rooms.
Barry I to think 1/2" is to thin, I`d put at least another 3/4" on there. Also If this is a cool area the tile is going to be COLD in the winter. If so have you thought about putting floor heating down. We did when we redid our bathroom last summer. We just started using it a couple weeks ago, would not do without. LOVE IT Larry
When I put a new bathroom in my basement a few years ago, I put in electric radiant heating under the portion of the floor that gets the most foot traffic. I like it very much and without it, since this room sits on the basement slab, the floor would be quite cold. I went with a 3'x5' mat and the non-programmable thermostat and I believe the cost was around $250. Obviously, price goes up with the sq. footage of mat that you're buying. Only requires a 20 amp circuit to power it.
I'm no tile expert but you can not just lay tile backer over joists. I'm pretty sure it has none of the load-bearing qualities of plywood, its main benefit is for adhesion of the thinset and tiles. The area around a toilet is going to get a lot of foot traffic and weight on it. I'd probably do some extra bracing, lay 3/4 plywood and then 1/2" tile backer. If the whole floor is torn up, maybe lay another layer of 1/2" around the whole bathroom and then 1/4" backer on top of that. Whatever way you choose, I'd shoot for 1 1/4" of ply and backer before tiling.