Footer is in new shop on the way

Posts

Footer is in new shop on the way

#1

Footer is in new shop on the way

Dustmaker Mike

Well the footer is dug out and concrete will be here this morning. By the end of the week the foundation will be done. Next week they pour the drive way and the floor. I had them put the foundation at grade level so I will have about a five foot high crawl kneel space under it to store lawn equipment and stuff. Framing should be done by the end of next week. All I have to do now is pull the siding off the whole house and replace all the windows and doors as well as reside the entire house. Glad I have two weeks at home before I travel again.

Re: Footer is in new shop on the way

#2

Ellis Walentine

Nothing like...

Ellis Walentine

... diving right into a project, eh Mike? I'm curious as to what kind of lawn equipment you have that will stow away in a one-foot crawl space. Trained lawn beavers maybe?

Sometimes you have to take the bull by the horns. Many years ago, I really wanted a window over the stove in our house but I didn't have any round tuits, so one night I went outside with a sledge hammer and put a hole in the wall. The new window was installed and trimmed within two days.

Keep us posted with progress shots of the new shop.

Ellis

Re: Footer is in new shop on the way

#3

How exciting!

Tony - Memphis

I remember when my shop slab was poured. I happened to be out of town then they started. When I came back, I had a slab! Not sure why, but they poured the shop slab before the house slab. Anyway, it was pretty exciting to see. My old shop was half the two car garage (no heat, ac, etc.). Funny, the shop is 16x20' and I felt like it was HUGE. Now I think it is tiny! Hope the project goes well. Congrats.

Tony

PS The next exciting part was the day in August when I showed up and the job site and there was frost on the shop windows! They had installed the ac and the workers discovered it. It was hotter than heck outside and my shop was nice and frosty.

Re: Footer is in new shop on the way

#4

Ellis  Reread

Larry in NW OHIO

Ellis I think you misread Mikes post about the crawlspace. Unless I read it wrong.Larry

Re: Footer is in new shop on the way

#5

Ellis Walentine

Hmm

Ellis Walentine

I didn't see the word "five" the first time. Gotta demand a refund for that speed reading course I took. :)

Thanks,

Ellis

Re: Footer is in new shop on the way

#6

Don't reread it I edited it.

Dustmaker Mike

Just cause I could :D

Re: Footer is in new shop on the way

#7

Woody Allen once said

Bruce, a MN Galoot

he took a course on how to speed read. Then he read "War and Peace."

It's a novel about Russia, he said.

Re: Footer is in new shop on the way

#8

Re: Hmm

Barry Irby

I think I am glad he admitted he edited it, cause I did not see the "five" either.

OTOH, I thought the Edit thingy only lasted 30 minutes and Ellis waited longer than that to read it. Hmm indeed.

Re: Footer is in new shop on the way

#9

Ellis Walentine

Edit window is now two hours

Ellis Walentine

I changed this variable on March 8. I wondered if anyone would notice.

Cheers,

Ellis

Re: Footer is in new shop on the way

#10

Re: Footer is in new shop on the way

Big Dave

Very cool!

The "early" progress is always the most notable, but getting the framing done is when the real work begins...

Big Dave

Re: Footer is in new shop on the way

#11

Re: Edit window is now two hours

Barry Irby

As a Home Inspector, I miss NOTHING. Well, mostly I miss only little Cosmetic things. But then, everything is cosmetic, right?

Re: Footer is in new shop on the way

#12

Jesper, Denmark

Re: Where's the pics??

Jesper, Denmark

We do expect this to be a weekly feature, so at the end it will become an article for all to see how it's done :b.

Actually, I was thinking of you yesterday on my way home from a 4 day trip to Japan. Return journey went something like this:

Fly Fukuoka to Nagoya OK on ANA.

Lufthansa fligth Nagoya-Frankfurt delayed 1� hours due to late inbound.

Scheduled 2 hour lay-over in Franfurt to connecting flight reduced to 30 minutes - not good in that mess of an airport, so LH re-scheduled to too late flight for me to catch my train in Copenhagen.

Made the original Frankfurt-Copenhagen flight, but was delayed to remove bag from a no-show.

Scheduled arrival CPH was 1915 and scheduled train departure was 1940. My bag arrives on carrousel at 1940!.

Caught the following local train 1944, and made Central Station connection to original train with 30 seconds to spare - as it's departure was 2 minutes late.

Mission accomplished - with a little (insert your favorite nationality here) ingenuity.

Travel time door-to-door: 24 hours.

Re: Footer is in new shop on the way

#13

Good to hear Mike

Don Orr

Hope everything goes smoothly for you.

Re: Footer is in new shop on the way

#14

Building a shop also....

Erik in Augusta, GA

I'm going through the same process now. Slab is poured and framing complete...need to get the roof on, then windows and siding. Let me know if you want to compare notes.

Erik

Re: Footer is in new shop on the way

#15

Re: Building a shop also....

FredD

That's a nice start Eric, coming from a old Carpenter , it is refreshing to see you have sheared the walls with plywood rather then the ubiquitous OSB

Keep the pics coming.

FredD