Bathroom redo

Posts

Bathroom redo

#1

Bathroom redo

Larry in NW Ohio

We are going to redo our bathroom and I wanted to ask the collective about how to do it right? After we get it tore down to the studs, how and what do we replace it with? I want to do it with tile and put a floor heating coil on the floor. Wehave linolium on the floor, so that needs to be taken up, that much I know. So what do I need to do after it`s cleaned out? Thank everyone. Larry :b :b

Re: Bathroom redo

#2

Re: Bathroom redo

Nat Robison

Well, at least you have a very narrow question at the end of your post. (Kidding). You'll probably get a ton of different responses.

I put in a bathroom in my house a few years ago and I went with a tile floor with an electric warmer underneath. I love it and it really takes out the chill, especially since it's laid over the basement floor. It is not, however, the same as radiant heat and would not suffice to heat a room. Since this is an existing b-room, I assume you have a heat vent already there. I did not cover the entire footprint of the room with the heating mat and since it can add a bit of height, I would suggest using a natural tile product (slate, tumbled marble) that has a bit of variation already.

I went with a standard 5' tub but if I were doing it again today, I would go with a 5' shower pan (basically a tub with a 6" side height) and curtain since I really have no need for a full-sided tub in that b-room. It just means more tiling in the shower surround so it's a trade-off. You can find them on most manufacturer's websites (American Standard, Kohler).

Re: Bathroom redo

#3

3 Rooms done

Jim Shaver

Hi Larry,

I did three bathrooms last Feb-April. Before I tore anything out I did a few things, I documented the space clearly with measurements and took those with me to suppliers so I could make choices more clearly. I also worked out in the space in advance what I wanted the new layout to look like. I created a budget and worked with suppliers for pricing, often buying a few things to get discounts. I also looked at order items and lead times, very important if it is a pacing project item, order it early. Storage space for your tools so you can find things when you need them, DAMHIKT. Clean up EVERY DAY, it helps ease the stress, focus on making advances daily, steps, not home runs. Do your homework when it comes to execution, you need to get it right when it comes to any room with water etc. document and take pictures as you go, seeking help from a source helps when you have pictures and measurements.

I tore my three rooms back to studs, hired out some work for things I was not comfortable with, work to your strengths, pay for what you know you can't do.

Take care,

Jim

Re: Bathroom redo

#4

Re: Bathroom redo

Frank on Chestnut Hill

Larry,

In a past working life I rebuilt many a bathroom...... In all cases when insulation is present above the ceiling I leave the ceiling dry wall in place and drywall right over it. Unless you suspect a serious problem in the ceiling it makes a some what faster and less problematic job.

Re: Bathroom redo

#5

Re: Bathroom redo

Andy Lincoln,in Dearborn MI

Larry,

You talk a guy like me,24 yrs as a carpenter to cross the Michigan/Ohio line and do it for you!!just kidding.

You have gotten some great advice from the previous posters.When I did my own bath remodel in our previous house(1 full bath ,1 half-bath for potty and teeth cleaning but no shower facility) I made sure and bought every thing I thought I would need.,tub,faucets,vanity,floor time,thin-set,cement board ,green board,gfi's,fan,light fixtures,etc.Every time you forget something it adds a couple hours to your project,with one full bath you learn to be efficient. I staged it all outside and took a couple days off near Easter and by Monday we were showering at home again!!

A bath remod is slated for my current house and per my wife's wishes I think the tub surround will be Swanstone or Corian or some synthetic material that will allow me to create the tub surround in three solid pieces with minimal caulking/seams.And NO GROUT to install,clean,seal,re clean,seal,etc.Bath tile is my wifes biggest complaint when it comes to cleaning.It may cost more short term but speed,and ease along with cleaning ease is going to pay in the end.

if you have a 1940/1950 bathroom with ceramic tile/plaster etc on every wall do yourself a favor buy an electric chipping hammer,HF has one for around $80 with a 2 year warranty and get a dumpster delivered to your driveway,the tile,thinset,metal lathe etc gets heavy very quickly.Go to HD/Lowe's/etc get a couple small 20-25 gallon (or less) trash cans that you can fill and then dump.Too big of a trash can and it gets way to heavy to haul and dump.

best of luck,

Andy

P.S. : If you need a hand I am right up from you in S.E. MI we could do breakfast at Waffle House.

Re: Bathroom redo

#6

Re: Bathroom redo

Earl Kelly

Larry,

If you're tiling check out the John Bridge tile forums. Lots of good info.

http://www.johnbridge.com/vbulletin/forumdisplay.php?forumid=1

Earl

Re: Bathroom redo

#7

Re: Bathroom redo

Frank on Chestnut Hill

John,

Another thing I have done that has worked out well is to install a fan time delay switch to allow the fan to exhaust the room after you leave. These devices can be set for different defaults and even though you have hit the switch and left the room it continues to run for a set number of minutes. It does wonders for keeping the tile grout in good shape. I paid about 40$ for one.

Re: Bathroom redo

#8

Re: Bathroom redo

Larry in NW Ohio

Andy Thanks for the job application, But I have a friend that is a contractor and we have him lined up to do most of it. But the Waffle house sounds good. Larry