Need some advice on drywall cut/repair
Tim Greif - West of Chicago
>Oldest son bought a home and wants to add more lights and outlets to the garage shop, mostly autoshop, minimal woodworking. Everything is wired with Romex (NM-B). His load center is in the basement about 10 feet from the garage wall so no need for a subpanel, since any circuits can easily be added from the main panel. We want to remove three vertical sections of drywall to add the 220 outlets, add light switches and run switched circuits up into the garage attic space.
My question is with regard to how much or little drywall to remove to accomplish what we want. One electrician I know indicated it would be fastest to add remodel boxes that simply grab the drywall from the back and fish in the Romex with chimney sweep wire as a fishtape. I know it's possible because I've seen it done, but I prefer to remove the drywall, add "real" boxes with conduit to enable future changes or additions from the basement to the garage attic and terminate the conduit with a junction box for transition from THHN to romex in the basement and attic. I can see trying to remove just enough drywall to span one stud space being a teensy bit fussy. Trying to cut it so that it allows a new patch piece to lay center to center on adjacent studs sounds like it might be tricky.
Would it be easier to just cut the drywall at the inside edge of each of the two studs with say something like a Rotozip? And then nail or screw a cripple next to each one to fasten the drywall patch piece to?
I'm hoping someone else has done something similar to this before and will show me the way.



