Re: Sheds - Codes and my $2.00 worth
Ray Carson, Lawrenceville, NJ
>Since I'm currently enrolled in Building Code classes I can't stress the importance of checking the local building codes. In Jerzee, it's 100 sq.ft. max. floor area without a foundation. Stick built.
There are certain requirements for sheet metal and plastic sheds now also so check this out with your local code Dept. Plastic sheds around this way have to have a restraining device of some sort tied to a anchoring in the ground....that is a certain depth.
In my opinion, I'd stay clear of plastic sheds, the appeal is nice, but they expand and contract like nobodys business. They will over time become faded...and some will become brittle or the fasteners holes will become weakened from the expansion and contraction. This makes for a weak joint. Now I'm sure someone will disagree and argue that these types are fine and I'm okay with that. I'm no expert on plastics sheds or plastics. I'm speaking from experience and the advice from friends and neighbors. To me, it makes sense.
I've built a few sheds and I'm in the process of finishing the plans for another at my current residence.
I'm also ACAD proficient and drew the plans myself so that was a big help. I could lay out all the sizes, roof angles, bill of materials, etc. It makes shopping for the materials a WHOLE lot easier. Even if your not CAD literate, I recommend creating a bill of materials.
You'll save a lot of time running back and forth from your Home Depot, Lowes, home center, lumber yard......and possibly all of the above.
In my experience, building a stick frame shed is more economical than buying a kit, or having a pre-built delivered to the site. Of the half a dozen sheds I've built, biggest being 12 x 20, a shed that is 8 x 12 usually takes about 3-5 days. This of course depends on some of the items I've thought of below.
Some things to factor in:
Knowledge of tools
Access / ownership of tools
Assistance from friends and family (raising walls, carrying sheet goods, etc.)
Access to the building site for materials
Delivery time for materials (if delivered)
Pick up and load time of materials (if purchasing) Getting the material to your residence can be an issue. I usually rent or borrow a truck because I own a SUV. Home Depot and Lowes rent theirs for a reasonable price. You do not want to running back and forth too often to the suppply place with todays gas prices.
Rent or borrow nail guns. (somebody already mentioned this)
Consider the weather. If you buy the materials and can't get to the project until it's decent out, then you need to protect the materials from the elements.
Have a plan, write things down as they pop into your head, stay organized, plan 2 or 3 steps ahead so that you don't forget something or make mistakes. Mistakes cost money and time.
If you have help, let everyone know what your thinking. Communicate.
I can't tell how helpful it is to have someone cutting while your assembling but they have to know what the plan is.
Sounds like you have put some thought into your project already and I've said enough.
In the end, you have to do what fits your time and budget. I hope I didn't offend you. I'm no expert, I've just done this too many times and have learned from my mistakes.
Oh yeah, if you do decide to build your own, take pictures. It's great to have PICS of friends helping out with projects like this. Let us know how you made out Carol and share your picks here at WC.
My $2.00 worth of advice (inflation)
Sincerely,
Ray