>My new house has a 100A main panel. It is maxed out in terms of breakers. There is an electric dryer and central air, which does not leave a lot of amps for a shop. I want to pull a 50A sub panel to my new shop which will be in a detached 2-car garage. So I will need to get the main electrical service upgraded to 200A. I know all of the technical details involved in this, I'm an electrical engineer. I just have no idea how much an electrician might charge for this work. Anyone who has done it and is willing to let me know how much it cost would be appreciated. This will be done in Northern NJ. Thanks.

Re: Anyone had an electrical service upgrade?

#2

Re: Anyone had an electrical service upgrade?

Vijay

>I am in the Bay area California. It cost about $ 1800 for a 200 A service and new panel and breakers about 4 years ago. No sub panel work.

Vijay

Re: Anyone had an electrical service upgrade?

#3

Re: Anyone had an electrical service upgrade?

Randy Johnson Connersville, IN

>Is there any way you can do the job yourself? Some places forbid homeowners to do anything in the way of home improvement without bringing in a contractor, but that is usually an rule pushed through by the contractors. More commonly you can DIY but must it must be inspected first.

The chances are you already own most if not all the tools needed for the job.

Re: Anyone had an electrical service upgrade?

#4

Re: Anyone had an electrical service upgrade?

Nat Robison

>Electrician rates will probably vary but I had my service upgraded and moved about 12 feet last year. A new 150 amp panel, a new feed from the meter to the panel, and extending some of the existing circuits to the new panel was about a 5-hour job. The labor only cost me about $400 since the guy did it as a side job. The panel was on clearance at Lowe's for $30 and all the wire probably cost around $150.

I can do basic wiring and hookups but I'm certainly no engineer or electrician. I would personally be leary about working with the "big wire" from the meter to the panel, but the work inside the panel seemed pretty straight forward.

Re: Anyone had an electrical service upgrade?

#5

Re: Anyone had an electrical service upgrade?

Sean Troy

>Why not run a seperate meter on the shop and a 100 amp panel?

Re: Anyone had an electrical service upgrade?

#6

Re: Anyone had an electrical service upgrade?

Mark Mandell - Gone Round In Jersey

>Figure $1,500 to 2k + materials, that's if your service line will deliver 200. I had a 50amp sub put in for my shop and it was $500 just for the panel mounted a foot from the main load center.

Re: Anyone had an electrical service upgrade?

#7

Re: Anyone had an electrical service upgrade?

John K Jordan

>Can you do it yourself? I upgraded to a 200 amp box once and it wasn't difficult - the hardest thing was to snake the service wires through the conduit bends since I was using free wire that was larger size than needed. I ran new wires all the way from the roof but it would be even easier to start at the meter or easier still to reuse the wires going into the existing box if they are big enough for the current and long enough to reach inside the new box.

If working in the meter box, the utility company can disconnect the wires at the pole, otherwise they can pull the meter. Connecting the old wiring to new breakers should be simple unless the person who did it before didn't leave enough slack. It should take less than a day of effort for the entire job.

But did you add up the current usage to make sure you need more capacity? Even with 50 amps to the shop, you shouldn't be running more than lights, dc, and one major machine at a time. If you have enough current capacity and just no more room for breakers, you can usually use 1/2-sized breakers to free up some space.

JKJ

Re: Anyone had an electrical service upgrade?

#8

That's about what I'd expect

Neal in San Jose

>Pacific Graft and Extortion, woops, I mean Pacific Gas and Electric usually installs oversize feeds to the meter when a house is originally built, so that when you upgrade it does not require a new run from the pole. Part of the cost is for P.G.& E. to provide a technician to shut off power to the meter/panel so you can work on it, then inspect the work, and then restore the power. They are usually quite responsive and helpful.

Re: Anyone had an electrical service upgrade?

#9

Re: Anyone had an electrical service upgrade?

Dave Bair, Eaton Rapids, MI

>I, too, have 100 amp service and run an electric dryer, AC, furnace, water well pump, 2 electric ovens and a 50-amp subpanel in my shop, all using �-sized breakers. My main panel is really, really maxed out now, but it all works well.

Re: Anyone had an electrical service upgrade?

#10

Re: Anyone had an electrical service upgrade?

Mike in Savannah

>Then you have the same problem as I do: Its hard to work in the shop in the summer (AC running in the house) while SWMBO is drying clothes, washing dishes and cooking all at the same time. The rpm of the electric meter is higher than my router! Talk about carbon footprints!

Re: Anyone had an electrical service upgrade?

#11

Re: Anyone had an electrical service upgrade?

Barry Irby

>In the Richmond Va area I would expect that to be about $1500, just to up grade the house, not the subpanel in the garage.

Might look at a separate meeter of the garage. Even if they charge some sort of minimum it would take a long time to eat up that kind of money.

Re: Anyone had an electrical service upgrade?

#12

Re: Anyone had an electrical service upgrade?

Mike R

>Rob,

I live in Monmouth County and had my panel upgraded about 3 years ago. Quotes I got were all over the place - average was around $2,500 (I had 3 or 4 guys give me quotes and one was something like $3,500 and none were under $2,200). I priced out the material need at the time and figured it was about $500 of materials (panel, wire, breakers, etc..). I ended up using a "friend of a friend" that was an electician that did side jobs. I also asked him to re-use the breakers in the old box as they were only a few years old and of good quality (previous owner put in a new 100amp box). In the end it cost me $800 cash + materials and he did it in a day and that included running a short 220 line for me and putting in a few outlets in the shop - probably took the guy 5 hours total. Running your sub-panel will add to this cost naturally.

I would figure out the material cost and then you can see the profit you are offering somebody. I did this recently with a plumber and when he realized I knew the profit and how much time it would take (I asked him how long it would take and didn't tell him I knew the material cost until after he gave me the first estimate), he backed down on his original estimate by a significant amount (his original profit per hour was crazy and we got down to a more reasonable number).

Mike

Re: Anyone had an electrical service upgrade?

#13

Re: Anyone had an electrical service upgrade?

David

>About five years back it was $1300 to upgrade from 100 to 200 amps (in Central NY). That included everything and burying the line in conduit. Couple of months back I installed a 100 amp subpanel in my barn/shop. Materials for that (125 feet of 2-2-4, grounding rods, service panel, conduit, etc. -but not the wiring in the barn) ran about $600. I did all the work. Don't know if this helps but you asked...

Re: Anyone had an electrical service upgrade?

#14

Once, while replacing..

Ray Carson, Lawrenceville, NJ

>an outlet, I got a heck of a jolt. I would consider that a definite eletrical upgrade. (To my heart) :-)

Sorry Rob, I saw this post a couple of days ago and couldn't find the time to reply. I also couldn't resist the urge to add a joke. A little electrical humor there. I too live in New Jersey so the rates where you live aren't much different in the Northern area than they are here in Mid-Jerzee.

Seriously, my wife and I put in an above ground pool this past summer and hired and electrician to do the hookup. I saved a few bucks by assisting the electrician (whom I didn't know) with some of the grunt work. Digging the ditch, running the Romex from (near) the panel to (near) where it would exit to the outside. Let the professional purchase everything that is needed because they usually can get it at a better cost AND if they are a decent PRO they won't install junk. (My experience only)

Plan on paying between 1,500 to 2,000 for a service upgrade. Not counting the "mud cable" if it doesn't meet the needs of the new service. Not sure about a "sub" panel cost but there are definite benefits to going that route.

I would call around and get a minimum of at least 3 estimates. Find out if the electrician is willing to let you do some labor to help combat the final bill. Remember....

IT DOESN'T COST A DIME TO GET AN ESTIMATE AND ASK A QUESTION. At least the last I heard it didn't. :-)

Anyway, couldn't help but add my little joke there and I hope I helped .

Ray

Re: Anyone had an electrical service upgrade?

#15

Re: Anyone had an electrical service upgrade?

wudwork

>Rob, Unless you purchased the existing breakers very recently, put new ones in. Good idea to call Utility and confirm you can extract more amps from existing wires. If you municipality does the Utility work, you might be able to get them to trench out and run underground service. I asked my Utility (non-municipality) and they quoted $5k since they had to replace the aging pole at street. YUP!! you read that right, they wanted me to pay for pole replacement !!! Not gonna happen.

As for parts, you can price them at home centers; 200amp service should run around $600. Also, ask Utility for cost of the new meter pan.

I pulled the meter, but did NOT cut the wires going to street right away. I pre-made an extension cord with romex, stripped the loose end and plugged wires into meter socket. That way I had lights/drill during project. Took maybe 4 hours? Truly the only exciting part is reconnecting the hot wires up high. Utility came and cleaned up the connections (installed connectors called "bugs"). Municipal permit ran $40. HTH, Tom