Home Articles Forums Gallery Marketplace Videos

WoodCentral Forums

Knowledge You Can Build On — Est. 1998

A natural, durable finish with minimal coats and fuss popular among woodworkers, flooring professionals, and furniture makers

OT - suspended ceiling installation

Posts

OT - suspended ceiling installation

#1

OT - suspended ceiling installation

John E. in SC

>I am finishing a room in my previously unfinished basement, and it's finally time to do the ceiling. I initially was thinking of a product called "ceiling max" sold at the big blue box, which is basically plastic runners that you nail directly to the floor joists above and then use typical suspended ceiling tiles. Now, I'm leaning more toward a traditional suspended ceiling, mainly because: 1) I've got 9' of ceiling height now, so losing 6" won't really hurt; 2) I don't really like the longterm prospects of a "plastic" ceiling - would much prefer metal like that used in suspended applications; and 3) The ceiling max stuff is expensive - actually appears to cost more than the metal stuff, from what I've seen. The problem is, I can't really get anyone who puts these in for a living to return my calls - they apparently don't want to bother with only a 300 sq. ft. room, and I absolutely HATE to beg someone to take my money. So here' s the question - has anyone installed a regular suspended ceiling themselves? If so, any good instructions, pitfalls, etc? I did all of the drywall and trimwork myself, so I'm not above tackling this if it's "doable", but I just don't have any prior experience to base that decision on.

Thanks for any help.

John

Re: OT - suspended ceiling installation

#2

JL

Re: OT - suspended ceiling installation - Long

JL

>I've done several, including my future shop area and a variety of others. My shop has cinderblock walls and conduit down to the receptacles. I put 2 x 4s as "spacers" around the perimeter.

Figure how what sort of ceiling you want. Do you want 2' x 2' tiles or 2' x 4' tiles. The smaller tiles make it look less institutional. Plot out your ceiling on graph paper.

You will need main Ts and cross Ts. Typically you'll want the main Ts to go in the longest direction. They are often 12' long (mine were). The cross Ts are 2' and go between the main Ts.

You'll want to "center" the tiles in your space and have partial tiles on the edges (it looks better that way IMO). Count up the number of tiles, the amount of main Ts that you will need and the number of cross Ts. Add a bit for wastage.

You'll need a level, a drill driver, a jig or saber saw with a metal blade (or to be very good with a hack saw), pliers, metal snips, a riveter and rivets.

Measure the perimeter. Your side (L) brackets will go on the perimeter. You will need a drill drive with a eye hook bit. Get a spool of heavy gauge aluminum wire and eye hooks. You'll probably need a couple of hundred feet of wire. (This goes from the T's to the joists and is what your ceiling hangs on).

Do the electical first. It's not fun working through the grid.

Establish a level line around the perimeter of the area of your shop. Start in one area and progress around the shop. Do it again in reverse (or buy a laser level). Having the L brackets level is very crucial to having a level ceiling.

Put the L brackets up, fasten them securely in the wall. Hang the main Ts using twine or string. You can put a couple of cross Ts to help stabilize. Wire up the main Ts to the joists and get them level. A level with a magnetic side helps a great deal. I rivet the main Ts to the L brackets at this point. I usually do every other main T. Put in the cross Ts. Add the ceiling lights. You'll probably need to have extra wire around the light fixtures so the ceiling won't sag in those areas. Put in the ceiling tiles.

You're done. A typical installation takes me a day or two. Others may have their own way of doing it.

Re: OT - suspended ceiling installation

#3

Re: OT - suspended ceiling installation

Grant Smith

>John,

Andersons web site has pretty good info on installing the ceilings they make.

I have installed several of these ceilings and have these tips to offer:

-measure the width and length of the room and decide where to install the grid. Avoid starting with a full tile along any wall, because walls are never straight. Try to have an even partial tile on opposite sides of the room.

-Assuming you have floor joists above, install the long main beams perpendicular with he joists to provide points at which to hang the wires from.

-rent, borrow, or buy a laser level to provide a level line around the room. There are other ways including a water level, but the laser level makes it go quick. Install your wall angle to this line.

-Note that the main beams have slots to receive cross tee's (4' sections)every 6". Measure the overall length of the room and cut your main beam pieces such that the distance between the first slot and the wall is the same or nearly so on each end. This ensures you'll be able to install the cross tees an even distance from each end.

-with help, snap a chalk line on the bottom of and perpendicular to the joists where you will install your main beams. Hammer in a long roofing nail to every third beam along the line so you can install a wire to suspend the main beam.

-Connect suspension wires to the nails, wrapping the wire tightly to the nail. use pieces of wire that can reach about 6" below the plane of the edge angle. Now, chuck the end of each wire in your drill, and put downward pressure on each wire while you bump the drills trigger. This will make each wire arrow straight.

-Turn your laser level back on so it casts a mark upon the wires. check the difference between the hanging holes on the main beam and the laser line (something like 1"- 1.25" or so). Now, make a 90 degree sharp bend in the wire at this point so the main beam can be hung from the wires.

-Hang a main beam to he wires, drilling holes as necessary in the main beam to keep the wires close to perpendicular. Once one beam is up, work outwards towards the walls from that point by installing another main beam 4' from and parallel to the first. Make sure your cross tee slots are in the same place on each main beam. Now connect the two main beams together with 4' cross tees. If you are using 2x2' tiles, add 2' tees between and perpendicular to the 4' tees as you go. By the way, I think the 2x2 tiles look better in a smaller room such as a home would likely have.

-Install full tiles to the grid as you build it, they will help keep the grid square since they are square.

-Continue working from the main beams outward towards the walls, waiting to cut the final pieces to length along the walls until last.

-Before cutting the final end pieces to length, sight along the rails in each direction to ensure they are straight. Make adjustments as necessary to fine tune the straightness of each beam.

-When you have all of the full tiles (uncut ones) installed, and you are happy with the squareness and straightness of the install, cut to length the pieces around the walls and then cut the tiles to fit.

It is JUST THAT EASY!

FWIW,

Grant in Iowa<---not a pro ceiling guy, but I have installed a few.

Re: OT - suspended ceiling installation

#4

Re: OT - suspended ceiling installation

Mark Kauder, Phenix City, AL

>John,

I am doing my shop ceiling in accoustic tile. Because I do not have the luxury of your high ceiling, I did decide to use ceiling Max. Piece of Cake. I used a crown stapler to install the strips. Once I figured out the little ins and outs it went fast. I have only done a quarter of the shop - I am taking my time to spread the cost out, and I just wanted to see right now what the difficulty and cost would be.

I recommend it.

Mark

Re: OT - suspended ceiling installation

#5

That is a very easy job to do yourself.

Mike in Paradise

>I would rank it as 2 on scale of 1 to 10 with 10 being difficult. I have done many of them.

Heck a 10 year kid that knows how a level works and is not scared of a ladder should be able to do it with no trouble.

Really it is very, very easy to do..

Get the pamphlet from the big box in the display and go at it.

Re: OT - suspended ceiling installation

#6

Re: OT -A slight twist on twisting the wires.

Al Crandall (N.E. of Indy)

>I did a 24 x 28 and a 28 x 36 room years ago. These were 17' ceilings so I was working from scaffolding. Time counted, so I straightened each wire by cutting them long after wraping around the mounting nail, and then forming a crude loop in the lower end. Instead of chucking each wire in a drill, I bent a 90 degree angle in a 16 ga. finish nail and chucked the nail in the drill. To straighten the wire, I hooked the bent nail in the wire's loop, applied down pressure, and bounced the trigger. I couldn't have taken time to chuck up each wire individually. Everything else was just as you described.

Re: OT - suspended ceiling installation

#7

Re: I'm having a problem with mine

MaxM

>I installed a 2x4 suspended ceiling in my basement about 4 years ago. The ceiling tiles are now warping like mad, it looks like a padded room. I plan on either replacing the 2x4's for 2x2's or maybe get a little creative and use some sort of finished ply for the tiles.

Re: OT - suspended ceiling installation

#8

Re: OT - suspended ceiling installation *LINK*

BobP

>I recently completed a suspended ceiling in a portion of my basement that sounds quite similar to your situation.

Below are two links that I found to be quite helpfull. The first is to the Armstron web site where they offer installation guides for suspended ceilings. (I used the "loose grid" approach).

The second web site is linked from Lowes. I used their layout tool to "design" the proper grid pattern for my basement room. It was MOST valuable IMHO! My room has lots of corners (never again!) because I foolishly tried to maximize every sqaure inch of available floor space. The design tool accepted my crazy ceiling outline and picked an optimum grid pattern. You get to shift the grid pattern around to balance the cut tiles at the ends of the room. The printed bill of materials was great.

I used the 2x2 tile, I thought it gave a nicer look for not much more money in materials. Getting the perimeter L-bracket level is one of the most important steps. Get this part correct and the balance of the job will fall into place. WATCH OUT if you have a beam that is longer than the 12' length of the main beams. You MUST pay attention to the location of the "slots" that accept the cross beams! The instructions cover this.

It sounds like you have plenty of head room to work with so you will not have to place the tiles too close to the floor joist. I held mine at about 5" which is a bit too tight. 7" or more seems to be good. I installed the 2X4 florescent fixtures but do not like them because of the noise from the ballast.

Once you get the perimiter up and lay in your main beams the job goes quickly. Have a sharp pair of metal snips and I used a string stretched end-to-end to set the main beams. This was easier than using a level (laser or otherwise). Again, the perimeter L-brackets set the stagfe for the whole job.

You can do it ;>)

Good luck

BobP

Skillman NJ


http://www.lowes.com/lowes/lkn?action=brandPagePro

Re: OT - suspended ceiling installation

#9

Re: OT - UPDATE LINKsuspended ceiling installation *LINK*

BobP

>I noticed my link to the Lowes layout tool seems to be not working. I did something wrong.

Here it is in text form-

http://www.lowes.com/lowes/lkn?action=brandPageProcessor&brandpage=arce

This is actually one long line and may have to be pasted in two pieces or typed into the URL

I also tried again below.

BobP


http://www.lowes.com/lowes/lkn?action=brandPageProcessor&brandpage=arce

Re: OT - suspended ceiling installation

#10

Make your own suspended ceiling

Lee Schierer, McKean, PA

>I didn't care for the metal look in my shop so I made my own ceiling grid. It wasn't that hard to do and it turned out great.

I ripped pieces of wood and glued them into T-shaped pieces. I used my brad nailer to hold the T-shape while the glue dried. By overlapping the strips you can make pieces as long as you need. The cross Tees were cut from longer pieces and attached in place with pocket hole screws. I used dried 2 X 4's left over from another project, but any wood could be used.

Lee


img