WoodCentral Forums

Est. 1998 — 27 years of woodworking knowledge

Latest Project

Posts

Latest Project

#1

Latest Project

Alan Bierbaum, near Denver, CO

>Hello All,

I have not been very active on the boards lately. When I "retired"; I decided to take a couple of months off to get away from woodworking (was my full time "job") and start my HO gage train layout (tore the last one down 15 years ago to expand my WW shop). While building my RR empire; I was approached by a customer that wanted a complete bath room remodel. I explained that I was willing to build a few furniture items; however, I was not going to take on a complete bath remodel. A couple of week later, the customer showed up and asked when I could get started and how long would the process take. She explained that she had engaged a general contractor to do the tear up and all of the remodel work (extensive) but wanted me to build furniture quality cabinets and install them. I went to her house, looked at the job, gave what I thought was a high price and went home. She called the next day and said to come by with a contract. Today, I installed the last of the added items (mirror frames, door for tub access, and a little trim around the new shower) and announced the job officially complete. She happily paid the balance due. Mirrors still have to be mounted in the frames ("not my job").

The Before shot (that is my computer and case):


Over 200 bd ft of Red Oak and 5 sheets of 3/4 ply (for the unseen case boxes) later:

The Hutch (all solid Red Oak):


Left side of cabinets (I did the Med cabinet as well):


Right side of cabinets:


As I was leaving; she was talking about needing new home office furniture (large office); I may have to come back out of "retirement".

Re: Latest Project

#2

Re: Latest Project

Glenn Madsen near San Francisco

>Want to come to California and finish my bathroom remodel cabinets? ;)

Well done!

Re: Latest Project

#3

Re: Latest Project

Guy Kroll

>Alan, beautiful work.

Guy

Re: Latest Project

#4

Ellis Walentine

Nice work, Alan

Ellis Walentine

>I really like the A&C hardware, too. Looks like you're back in business!

Ellis

Re: Latest Project

#5

Great story...

James Dillon in MD

>... and wonderful looking cabinets Alan. Next time triple the normal price and see what happens 8-). Thanks for posting and letting us know how "retirement" is going.

Jim

Re: Latest Project

#6

Re: Latest Project

Donald Pierson

>In the eyes of an amateur it is daunting to see the work of a professional�beautiful work.

Re: Latest Project

#7

Re: Latest Project

John Pappas

>Alan, very nice. It's best you should be doing something more important than playing with your trains. :-)

Re: Latest Project

#8

So, Alan, could you come down

Johanna

>to NM and help me finish the installation of my home office suite? This last desktop (all 7 1/2 feet of it) needs to be contoured to the wall without messing up it's match to the center section. I think I bit off a bit more than I should have on this project! Still, if I can get that right, then all that's left is to apply finish to the three desktop pieces and do the base mouldings.

I love the bathroom work you did. It sure beats commercial cabinets!

Re: Latest Project

#9

Thanks for the nice comments

Alan Bierbaum, near Denver, CO

>Thank you all for the nice comments.

For those of you wanting help: My answer is exactly what I used to tell people (after a kitchen remodel) wanting help moving all the stuff back into the cabinets. Yes. I will be happy to help, for a nominal charge. I get $100 per hour and I work slow. No one took me up on the offer !

This was a fun project in many ways. Design with customer input was fun this time (needed to "match" adjourning bed room motif and downstairs dining room motif) yet be original. The customers were tall and wanted 36" high counter tops instead of the low bath room counter tops. The room was gutted with electrical radiant floors, new two person shower and a huge new tub. A short knee wall was removed. A "bench" was required for use by the tub. The raised section in the center of the cabinets was used to break up the commercial cabinet look and to hide some electrical stuff.

This was almost too large a project for my personal shop. I have always done jobs this large from a commercial shop, which disappeared when I "retired". I don't think that I want to do another job this large from my shop. A few furniture pieces can be moved around OK; however, a complete bath room project ended up scattered all over the place (including storing the hutch and bench in my living room).

Now it is back the the HO train world (most work done with a magnifying glass and tweezers).

👍 This page answered my questions

Your vote helps other woodworkers quickly find the answers and techniques that actually work in the shop.