Monday sweat equity
It's summer maintenance time. If a man and a half can seal a driveway and a half in a day and a half, how many driveways can six men seal in seven days?
Est. 1998 — 27 years of woodworking knowledge
Monday sweat equity
It's summer maintenance time. If a man and a half can seal a driveway and a half in a day and a half, how many driveways can six men seal in seven days?
Re: Monday sweat equity
Hmm ... looks like 2/3 of a driveway per manday.
Which way do you split a man in half...
and still get productive work out of him?
I would think if you split him longways, his work would be half-a... never mind ;-)
Steve
Re: Monday sweat equity
Could this possibly be as simple as 1 driveway per man per day=42 ?
Re: Monday sweat equity
No, I don't think so. Set up a formula and reduce it to driveways per man per day.
Re: Monday sweat equity
This sounds uncannily like the old saw, "If a chicken and a half can lay an egg and a half in a day and a half, how many pancakes does it take to shingle a roof?"
None
The correct answer is none. Any time you get six guys together, they will talk and discuss how to do it, where the cheapest materials are to be purchased, what the proper technique for sealing is, who's going to clean up and who's in charge for at least a week before they do any work. :)
Lee
No Bud breaks
28
That's what I got also ;-)
Re: No Bud breaks
A few six packs of bud is what will keep them from ever finishing 28.
Sorry, no
Answer
28 is the correct number. Congrats to Ed, Sharon and Dan. If 1.5 men can do 1.5 roads in 1.5 days, then 1.5 men do (1.5 Roads divided by 1.5 Days) 1 Road Per Day
This stands to reason: if 1.5 men do one road in one day then obviously they would do another half a road in half a day (1.5 men = 1.5 Roads = 1.5 Days, per the question). In a problem solving world
6 men would do 4 times as much work as 1.5 men (6 divided by 1.5 = 4) in the same time period. Hence, 6 men would do 4 roads per day.
If 6 men work for 7 days then they will do 28 Roads (4 roads per day times 7 days).
Another way
You can convert it to driveways per man per day like so: