Every now and then, there are discussions about finding, loading and hauling big log sections. I have my own Woodmizer LT15, but do like to keep my turning material as large as I can before I choose my blanks, so I thought I would share my method, if any of you might open to my tricks.
Sunday I went over to an old home-place and harvest a 24" - 20" x 10' long walnut log.
I had just sharpened my saw, so cutting it down and turning the top into firewood went pretty fast. But darn it, I had gone over without some of my loading tools, and didn't have any help. However, I have done this enough times to have some tricks that make the job easier and faster than you might expect. It only took about 2 hours total. Not bad for a 65 year old codger a bit out of shape from the broken ribs a little over a month ago. hum
To get a big log onto a flat trailer without the aid of a tractor, or any other power equipment, requires a little ingenuity. The first thing I do after dropping and cutting the log to length, is to cut a long wedge out of one of the larger limbs, then placing it near the expected balance point of the log.
To roll the log up the ramp, I use a chain wrapped so that the inside most wrap tightens or chokes the log, then has another wrap which unwinds by pulling over the top of the log with my truck, as it rolls up the ramp. When it gets to the top, and onto another couple of feet of straight log, I can push one end down, then back the end of the trailer under the high end, getting it about half in.
I keep several 2' long pieces of schedule 40 and 80 pvc in the truck for rollers which makes pulling it on up with a come-along easier. However, it can get hung on the back edge near the middle, so another trick, is to put another short log section under, about half way out to the end on the ground, then pull the truck forward. This and the first log wedge sections can act as rollers over the ground, while the PVC serves on the trailer, as I use the come-along pulling from the front of the trailer.
They sell logging choke-chains, with a ring or a slip hook on the ends, but you can do it with just the normal hook. It seems a little confusing at first, if you have never done this, but I've learned a simple little trick that speed it up. Lets say we have a 24" D log, so we know the Cir is a little over 6'. So from the truck / wedge ramp side, lay out the chain, and fold 7' of it back alongside the longer part. Now grab it at the fold, and go over the log, and come under, then up to the top, where you can hook it with a slip type hook, or send the link type hook through, and back over, hooking back down a few links onto itself, forming a loop in the end of the chain. The long end then goes to the bumper hitch or toeing hooks on the front of the truck.