finished table
John Lucas
Man what a week. I brought the table to work on Monday thinking I would get it shot. I took a short lunch break today and got it done. It is Walnut, most of which came from Chuck Jones. I did have to buy material for the legs because I didn't want to laminate 2 parts or do a bent lamination.
The top and bottom shelf are 2 part glue ups. The rails are 2- 8 part segmented rings glued together with overlapping joints. The top rail has 24 spindles and the bottom rail was cut into 4 parts with 5 spindles each.
To glue the rails and spindles I mixed west system epoxy to toothpaste consistency and put glue both the rail and shelf holes. then assembled everything all at once. That took some patience but worked perfectly. The spindle tenons were such a good fit that it had to go together just right. fortunately the glue had a little lubricating quality which helped a lot.
Can't say enough about the accuracy of the Vega duplicator for making all those spindles. They are identical to about .010" plus or minus a little.



