OT: "Flat" work with some turning
steve antonucci
>I don't think I've ever posted this here, but it represents my "flat work" experience for the last bunch of years. It started as a way to keep a 3 year old happy, and then progressed into a bit of an obsession.
It's my kids playset.
Phase I was built in 2001. Phase II 2002 or 2003. Phase III in 2006. I'm not done, but I don't foresee another tower going on it (unless the mood strikes me...) There are swings on the backside and climbing rocks on the back, the inside, and the connecting wall between towers.
Oh, yeah. I turned the seat for the rope swing.
Steven
I could have bought a VB for what I spent here...



