>Concrete poured and Seal and Cure rolled on. Next step, framing. I can't wait until it actually starts looking like a building.


img

Re: New shop

#2

Re: New shop

Don Orr

>Looking good Sean, real nice floor. Nice to see progress.

Re: New shop

#3

Questions

Tony - Memphis

>Down here, we just pour slabs. What goes over the open blocks? Also, what is the Seal and Cure stuff? Its always interesting to learn how things are done in different areas. We have no frost line here to speak of, and good solid clay, so they just pour a slab with a very shallow footing all in one pour. I treated my shop floor with waterproofing (smelly stuff!). Sometimes, I wish I would have been able to paint/coat it with the epoxy stuff, but you really can't see much of my floor now, so it doesn't really matter. Anyway, good luck with the new shop. Enjoy!

Tony

Re: New shop

#4

Re: Questions

Sean Troy

>The code for footers here is 24". Super Seal 20- Seal and Cure is the product I put on the floor. It's applied as soon as you can walk on the floor. I applied it 8 hours after the pour.2 coats rolled on.The product helps the cure process as roughing and sealing wood does the woodturning process. Cure time with this concrete is 28 days or so. Treated lumber as a plate goes on top of the block and is locked in by the bolts set in the block.Framing conected to that.

Re: New shop

#5

Re: New shop

Ray Carson, Lawrenceville NJ

>Sean,

Nice pour. Looks good so far. Sealing it was a great thing. Are you doing the construction yourself? If so, nice work.

Not sure where your located, but regardless, don't forget a good termite shield and possibly treating those open block cores with a termiticide before putting your sill on /down. We always specify all top courses filled solid in my line of work to add an extra bit of reassurance for a number of reasons, not just termites.

Be careful using an aluminum shield that is too thin if that's all that is available. The lime in the concrete block will corrode the shield over a short period of time if it's too thin.

Just my 2 cents worth,

Ray

Re: New shop

#6

Thanks

Tony - Memphis

>Sounds pretty similar to 'round here. They just run a treated board as a plate and go from there.

Tony

Re: New shop

#7

Steve Kubien

Looks like good weather...

Steve Kubien

>...and if it is as good as it seems, why haven't you got a lathe out there making shavings? C'mon, break in the new shop will ya!

Steve Kubien

Re: New shop

#8

Re: New shop

RonZ

>How can you be so calm about it. I'm negotiating on a new shop and that's all I can think of. My mind keeps presenting me with loads of possibilities. I wish you success and prepare yourself once you're in and realize you still need more room. =o)

Re: New shop

#9

Re: New shop

George Van

>Looking good Shawn, time to get framing, should be setting trusses or rafters tomorrow ;-)