OT - latest project (a little rambly)
Bill Houghton, Sebastopol, CA
>As my wife put it this afternoon, we are now committed to this bathroom remodel.
Usual structural issues that we encounter in This Auld Haus every time we open a wall, although I already knew we were going to need to blow out the outer wall.
So far, this project's unplanned excursion seems to involve reroofing the area above the bathroom to correct some issues.
I'm having fun showering outdoors, using a rig I assembled by the hot tub (although, at my creative son's suggestion, I'll probably hook up the mixing valve from the old tub/shower there so I can adjust heat directly at the shower, instead of at the entryway sink, as I did this am). The joys of state park camping again, without the tent.
Milestone: for 36 years, we've had a 4" cast iron vent pipe running up the outside wall, prominently in sight as you walk in from the driveway - the remnants of that vent are visible in the two elbows at the foundation. That will be gone now, as we vent the plumbing through runs inside the walls and out the roof, like everyone else does.
Previous owners created finish walls by nailing up random widths of 1" thick redwood (mostly - some pine and fir), gluing newspapers over the boards, and then wallpapering over the newspapers. We've found 1942 and 1944 dates - I'd always thought this area of the house was done after World War II, but perhaps it was during the war.
Hand tool content on this project is likely to be all but nonexistent, except for the usual ancillary use of chisels and stuff. Lots of sawzall action today.





