Bill Houghton, Sebastopol, CA

>Last year, I installed a subpanel for the shoplet behind the house because we were about to completely landscape the backyard and LOML agreed that the trench for the conduit should be done before the landscaping.

Today, I finally started pulling the old* wiring from the shoplet in preparation for rewiring, because I need to get the old overhead wiring out of the back entryway in preparation for the remodel of the bathroom off that entryway.

Now, if I could just figure out what house remodel project would necessitate building a new, larger shop. Missed my chance, really. I should have insisted on building our own kitchen cabinets, which would have required a big enough shop to do it.

*Really old: cloth-insulated knob and tube wiring with lots of funky splices, served by a single 20-amp circuit fed by overhead wires from the house 50 feet away.

Re: OT - remodels and shop improvements

#2

Just love that knob and tube wiring!

John in NM

>So 20 amps on that stuff feeding your shop? I can see why you're into hand tools! ;)

Re: OT - remodels and shop improvements

#3

Jim in Burlington Ont.

Complete rewiring job

Jim in Burlington On

>You will need to build a place to stay while you do a complete remodel. All knob and tube needs to be removed in one shot. I removed the knob and tube in one day and it took 3 months to complete the new stuff. Women get cranky without all the comforts of life so build the shop big and comfortable first. LOL

Re: OT - remodels and shop improvements

#4

Re: Complete rewiring job

Bill Houghton, Sebastopol, CA

>I should have been clearer - this is just the shop I'm doing now.

When I did the whole house, 15 years ago, I installed the circuits for overhead lights (of which there were darned few at the time) and new outlets, got signoff, switched over, and then redid the old outlets as a second phase.

Glad I did - I found some truly frightening things, like a closet light that consisted of one of those porcelain bulb holders sized to cover an octagonal box, with the wires just poked through holes in homasote and screwed to the terminals; then the porcelain bulb holder was screwed to the homasote. If there'd been any arcing ever, that closet would have been a bonfire.

Somehow, I've gotten by for 36 years with VERY limited power in the shop; lately, though, I've been dreaming of dust collection for the power tools, something I never could have before.

Re: OT - remodels and shop improvements

#5

Although (getting by)

Bill Houghton, Sebastopol, CA

>after a tree fell on the lines to the tankhouse, where the shoplet is, in the 1986 storm (missed the house by about 12"), I put up 10 gauge lines to minimize voltage drop. That helped, as I had tripped the breakers a few times before that.

Re: OT - remodels and shop improvements

#6

Funny, I did the outlets first...

Scott Burr in Ben Lomond CA

>Seemed the right thing to do in my situation. Lights come this fall when I actually get into the attic.