Pooched it again! (OT)
Gerry D.
>Rehabbing the first floor powder room for SWMBO's annual Christmas boarding house. Pulled everything out. Walls were a mess. Skim coated, and painted. Installed new baseboard and quarter-round. (Quite proud of self, coped joints that fit like a jig saw puzzle. Work done with coping saw, rasps, miter box.) Installed new commode.
Now here's the rub. The first vanity that the lady of the manor picked had drawer's at 21", the same height as the water lines. Picked up a different vanity. The back of the new vanity runs in a straight line from the top to the floor. The baseboard and quarter-round keep the vanity approx 1 to 1 1/2" from the wall. The vanity and back splash have to be flush. The vanity is open, with 4 post legs.
Appears that I now have to notch the trim work I was so proud of. Any possible suggestions as to how to proceed from this esteemed collection of galoots? I would really hate to have to pull all the trim out. Any methods for notching it in place. Willing to use electron burning devices to achieve ends. (mea culpa, mea culpa)
Thanks,
Gerry
In violation of the 7 P's (proper prior planning prevents piss poor performance)