More info Paul99
ThomD
>Four squaring, as per inquiry:
1) By hand, you plane the most stable side flat first. analyze this surface, and if there are some lopsided mountain ranges, adjust them specifically. Then work from the middle out. If you don't know how to plane flat, that is another subject...
2) Once you have a flat side, joint one edge to 90 degrees, work from the middle out, do not try to take picture book swipes the full length, at first. If you can't get a shaving in the middle, nock down the limps until you can. Concentrate on getting the edge planar. Check it to see if you twisted it, that is usually a stance and body mechanics issue.
Another flaw is cutting low the entry and exit, this is the result of not pulling the plane on and pushing it off; but pushing it on and pulling it off. It is also exaggerated by not working from the middle out.
If it is off angle there are many ways to deal with that from adjusting the plane iron for a few strokes; to just trying to correct by getting it right this time; to trying to put the plane more on the high side; to cutting in a rabbet that changes the slope, and then planing the tracks away. I once had a list of about ten things you can do. Find something that works for you.
3&4) Once you have two side, you just lay the others out with marking gauges, and hew, saw, or plane to those lines.



