Re: ?? about lumber rack construction
William Duffield, on the Cohansey
>Here is a photo of my lumber rack, before I filled it up.

It is attached to the 24" o.c. 2x6 ceiling joists with 5/16" bolts. The wall behind is CB, on a concrete footer, with a sheetrocked 2x4 insulated stud wall between the exterior CB and the lumber rack. The uprights are ripped from 3/4" veneer core CDX plywood with 2x4 spacers between, screwed and glued. The laterals are 5/16" through-bolted to the uprights. They are constructed of 2x4s and two gussets of 3/4" lauan lumber core plywood, again assembled with drywall screws and glue. Note the diagonal grain direction of the face veneer and the lumber core of the gussets. The lateral 2x4s extend 3 1/2" back beyond the ends of the gussets, but the 2x4 spacer blocks at the bottom of the gussets do not. Also, note that the grain of the 2x4 spacer blocks that tie the uprights together must run horizontally.
All the laterals can be easily repositioned. All the bolts have washers and nuts on the other end, but the nuts are really unnecessary. Even unloaded, there is no way a bolt would work loose without being intentionally driven out with a hammer and pin punch. To make it modular, you do have to be careful with the placement of the holes in the uprights and the laterals, to make sure they line up, but without slop. I made a jig, and drilled all the holes in the ends of the laterals on my drill press.
Also, carefully watch the vertical alignment of the bolt holes in the uprights. It's better for the lumber if it is evenly supported.
Note that the load on the ceiling joists is lateral, away from the wall and compressive. If your joists run the other direction, parallel to the wall, you will need to bolt each upright to a cripple nailed between the two nearest joists and at least add additional x-bracing out from those joists to help distribute the twisting load to the adjacent joists. The load through the lateral mounting bolts on the uprights is also lateral. Do NOT make the uprights from 1x4s, as overloading to failure would cause them to split. They must be plywood or better. Loading at the bottom is towards the floor, and also laterally backwards through the footer of the studwall and into the CB wall. When I installed the studwall, I put additional anchors through the footer behind the lumber rack into the concrete slab for this reason.
The little black spots in the photo are either the heads of drywall screws or bolt holes for repositioning the laterals. Use lots of yellow glue. The drywall screws do the clamping while the glue dries.