Home Articles Forums Gallery Marketplace Videos

WoodCentral Forums

Knowledge You Can Build On — Est. 1998

100+ Wood Species + Full-Shop Services: Lumber, Veneer, Tools & CNC. Everything in One Place.

putting a mark on floor to see if I moved?

Posts

putting a mark on floor to see if I moved?

#1

putting a mark on floor to see if I moved?

Ernie Miller Topeka

>I spent almos two hours in the shop last night working on the bench I thought I was getting some where but as I look back almost nothing seemed to get done. Do you people ever have these problems? What I did was install the hard wood drawer glides on two drawers. I had to cut them to length plane all the surfaces smoth and was them so they woulf slide easly then screw the parts to the drawer and cabinet carcus. It sure seems like I should have gotten more done? I was steady at it but progress was slow. Am I alone?

Re: putting a mark on floor to see if I moved?

#2

Re: putting a mark on floor to see if I moved?

Dave Anderson Chester, NH

>I don't know Ernie, it might not have been great productivity, but at least you accomplished something. I sometimes go down to the shop and end up sitting on my stool at the bench and acomplish absolutely zippo. Sometimes just being in the shop is reward enough after a long day at work. I figure that sometimes I'm motivated, and sometimes I'm not. Most week nites I set my goals really low and anything that gets done beyond that is a bonus.

Re: putting a mark on floor to see if I moved?

#3

Making and fitting drawers...

Dan Moening in Sacramento

>...is very time consuming for me as well.

Folks that have never had this opportunity will simply never understand why furniture with drawers cost so much more than without.

I generally keep the lines on my floor covered in sawdust ;~)

Dan.

Re: putting a mark on floor to see if I moved?

#4

Jim in Burlington Ont.

Re: putting a mark on floor to see if I moved?

Jim in Burlington Ontario

>Craftsmanship takes time. Just think of how many hours you spend cleaning up and sharpening.

Re: putting a mark on floor to see if I moved?

#5

Jack Guzman from Maine

Re: putting a mark on floor to see if I moved?

Jack Guzman from Maine

>When I'm woodworking I try not to think about time. It interferes with my creativity. It's distracting.

I do notice that after working on a particular operation alot more time has passed than I would have guessed.It's like everything else,time flies when you're having fun.---Jack

Re: putting a mark on floor to see if I moved?

#6

somedays I have to do that at work...

victor p houston

>

Re: putting a mark on floor to see if I moved?

#7

Re: putting a mark on floor to see if I moved?

William Duffield on the Cohansey

>Don't feel like the Lone Ranger, Ernie.

Some days, I can barely figure out which foot to put in front of the other one. Some days are a little better, and I actually find my way to the shop with a goal in mind, but when I get there, I can't figure out what the next step it.

Sometimes, in my enthusiasm, I pick up an item from Project A in one hand and an item from Project Q in the other, and then can't figure out which one to set down to pick up a tool to work on the other one. OK, I figure, I'll walk around with both hands full, until I find a tool for one of them. That works until I find a piece of Project J laying next to the tool to bring it to the next step. Now all I need to do is find a place to put the pieces of A and Q.

It's worse when I get enough projects close to the stage that they all need epoxy. Did I tell you I'm so cheap I won't throw away a few cc's of epoxy and an acid brush and a scrap of wax paper, if there's any possibility of using them on something else? At that point (equivalent to juggling rattlesnakes and chainsaws), I usually set everything down and go out and pull weeds, or try to teach Blackdawg to fetch.

Then there are the days I actually get into a project and make a lot of progress. Those are usually the days that I can successfully put out of and keep out of my head whatever it is that I was supposed to be working on that day.

Other days, I'm really creative, and come up with incredible and amazing new ideas. When I actually finish one, lots of other people tend to confirm my initial impressions, but none of them would have any idea what to do with the boxes full of pieces of other projects that gather dust and wait for me to pick them up with when the other hand is empty, and my brain is empty, but actually ready for that project, and my bench is clear, and all the tools are sharp, and the floor is clear enough that I could see the mark�

Re: putting a mark on floor to see if I moved?

#8

Re: putting a mark on floor to see if I moved?

Dean Burke - Yakima, WA

>Any operation that requires constant (re)checking for fit will take a long time. The trick seems to get to a point where your processes are predictable so you don't have to check things until the end. So the remaining drawers should go much faster.

Dean

Re: putting a mark on floor to see if I moved?

#9

The craftsman may be slow but...

Bob Hackett

>The wood is patient.

Can`t remember if I first heard that here or at BP.

Whatever happened to enjoying the ride there Ernie?

Stop actin` like an old yowlah and go out to the shop and make somethin`.Hey,no need to thank me,it`s my job.;^)

Mainely,Bob

Re: putting a mark on floor to see if I moved?

#10

Re: putting a mark on floor to see if I moved?

Todd O. Cronkhite Native of Maine

>I have days like that also Ernie. what kills me is time estamation. I fiqure I can do task X in a day, and it ulimately takes 3.

I can be easily distracted too. I'll be working on project "A" and be trying to solve a problem about project "B", and suddenly have a brainstorm and I'm of to project "B". I've had bits of projects laying around so long that I forgot what they where for and cut them up for something else only to remember later that it was a piece for a different project.

somedays I just astound myself at how much I got done, but those days are few and far between it seems. Ahhhhhhhhhhhhhhhh well, so it goes and I wouldn't trade my shop time for a million bucks either way.

Todd O.

Whose been wondering what project that mark on the floor was for. ;~)

Re: putting a mark on floor to see if I moved?

#11

If you treat life as a race ...

Angus Barclay, in New Zealand

>... then you've already lost. Millions of people have finished before you.

Take time to enjoy the time it takes, especially when the time taken is something as enjoyable as woodworking.

regards

Angus Barclay

- who is a very slow runner in life's race.

Re: putting a mark on floor to see if I moved?

#12

Not hardly

Bill Houghton, Sebastopol, CA

>I've lost count of the number of times I've felt like I didn't do anything - most recently when trying to figure out what was wrong with my son's car - spent two full days on it the first weekend and got NOwhere.

Just remember the other days, when things flow like a river.

And remember that fitting drawers carefully will pay off millions of times, as you open a smoothly fitting drawer. Shortcuts here will cost you many times over.

Re: putting a mark on floor to see if I moved?

#13

The Wheels of Time Grind Slow

Bob Hutchins in central Texas

>but grind exceeding fine.

Wish I knew who I was quoting.

BobH

Re: putting a mark on floor to see if I moved?

#14

Re: putting a mark on floor to see if I moved?

Tony Z.

>All the time Ernie! But, and I suspect many of us here are similar in this regard, when we look back over the past several months, we have a fairly decent list of accomplishments. Its sort of like watch a clock--never see the hands move, but they do!

Re: putting a mark on floor to see if I moved?

#15

You are not alone...

DONALD C THOMPSON

>I have a bench (more of a power tool bench, not a joiners bench), for which it took me over two years to finish the installation of six drawers.

The HoneyDo list would pull me away, and when I came back I could not figure out the spacing, etc., from my notes. (and who knew that plywood would bow so much?)

Re: putting a mark on floor to see if I moved?

#16

Re: The craftsman may be slow but...

Ernie Miller Topeka

>BAck the boat up there Bob I didn't say I was enjoying it it just seems strange ti take longer to install a drawer than it does to make. But I guess the process is a little more complicated than just pounding in some DT counter sinking holes waxing runners precise positioning. You think slap a couple 12 screws in and it good as go but noooo. I only got 1 1/2 drawers done last night but Affy wanted me to sit in the rocker and holder for awile. I might get the secocand of three boxes finished this weekend including placing of the precious knobs. and oiling of the box.

Re: putting a mark on floor to see if I moved?

#17

Re: putting a mark on floor to see if I moved?

David Linnabary

>Ernie,

One very satisfing thing I do in the shop is document my projects, usually on my shop drawings. I make "to do" lists and supply lists and joinery calucations, "bonehead mistakes", etc. I just love checking things off a list. I also like the feeling of knowing when I'm done and that I haven't forgotten anything.

Maybe it's just a coping mechanism for my ADD or that my woodwork is done in short stints of time with many interruptions. :) Maybe it's the way my family used to document so many things around their farm.

What ever the reason I just nice to look back and realize how much I really accomplished.

David

P.S. I find myself referring back to them often to get current projects going.

Re: putting a mark on floor to see if I moved?

#18

Re: putting a mark on floor to see if I moved?

Raymond in Trenton NJ

>Hi Ernie,

Just as everyone else said, I've been there and done that. There's points in every job where after you've worked like all get out, at the end of the day it looks like nothing happened. I think Sir William came the closest in describing my reality :o) I can just picture him pulling weeds and having bits of them stick to the epoxy dabs all over him.

I used to be slightly off on my completion time estimates just like Todd-O. After years of convincing, I've finally given in and switched over to LOML's formula for estimating. You should try it Todd it's easy. Take your estimate, triple it and go to the next higher time unit. For example you estimated that 'Task X' takes a day; the one becomes three and 'day' becomes 'week'. There ... 3 weeks! See how easy (and usually accurate) it is.

Raymond

who never said that the bathroom would only take three months ...

Re: putting a mark on floor to see if I moved?

#19

Ray, according to your formula..

Todd O. Cronkhite Native of Maine

>your bathroom is gonna take 9 YEARS!?

Me think you gonna be in a heap-o trouble with who know who. :~( Oooooooooooooooooo Sucks to be you. ;~)

Thanks for the estimation tip, I'll test it's accuracy sometime.

How's the healing progressing?

Todd O.