Perennial Porch Project Passes Perusal
Bill Houghton, Sebastopol, CA
>Yee-haw! The city inspector came by today and signed off on the final inspection on the porch! The permit is less than two years old, but not by much (June 17, 2002), and it is right nice to get it done. Since our town observes the building code standard that a permit not inspected every six months dies, we've had it hanging over us all the time; so this is a real relief. Big project: we had to go down to the foundation, while holding the porch roof and posts up with the other hand (actually, with 2x6s supported and cross-braced out front and tied back to the house), and build it up again.
We preserved the porch railings, but those are MY new railings and balusters down the steps. Our son made the metal handrail.
It's not actually quite done - I need to turn finials for the tops of the posts, which requires getting the $10 lathe running again - but there's finally no deadlines on it.
Hybrid technique use. Lots of electrons died, but plenty of hand tool use too. For instance, I could not have done the railings without hand tools, and trimming the half-posts back against the house to accommodate the ever-so-slightly higher porch deck would have been impossible without a sharp hand saw. LOTS of hammer use.