Underlayment for linoleum
Hoa in Alameda
I need to install linoleum flooring for a bathroom upstair.
The 30 yr. old flooring was linoleum over 3/8" particle board underlayment. Due to water leaking, the underlayment literally fell apart when I removed the linoleum.
Should I use plywood or particle board for underlayment? I realize particle board + water is bad combination. But it immediately tells me that there is a water leak problem. Plywood may hide the problem until it's too late.
The plywood subfloor is structurally sound. It is just not even, thus the need for the underlayment.