Home Articles Forums Gallery Marketplace Videos

WoodCentral Forums

Knowledge You Can Build On — Est. 1998

REAL MILK PAINT

crown moulding question

Posts

crown moulding question

#1

crown moulding question

Bruce, a MN Galoot

I know, this is a carpentry question, not fine woodworking, but I'm stuck.

We are trying to hide problem with the drywall on our ceiling. The house is 18 years old and uses trusses for the ceiling/roof. As you know, these seem to move a lot, and the drywall seams at the junction of wall and ceiling have opened up a bit. One way of fixing that is to replace all the taped seams, but we've been given estimates of $3-4,000 for that job, which includes removing all the texture and redoing the entire ceiling, maybe 600 sq ft.

What we want to do is install crown moulding to make the problem go away. The biggest problem is where the vaulted ceiling meets the level ceiling over the stairway to the basement, as shown in the picture. The moulding along the vaulted ceiling will need to taper or something to meet the moulding along the wall to the left. I can't envision any way to match up those pieces. My question is how to do this. Any hints would be greatly appreciated.


Re: crown moulding question

#2

Re: crown moulding question

Stuart Johnson

I'm sure you will get some good answers here but you might also want to check some of this guy's youtube videos: https://www.youtube.com/user/dfwcrownmoulding

Re: crown moulding question

#3

Re: crown moulding question

Dick Coers

You would have to put in a dropped section to lower the ceiling line of that nook. You could add tapered runners to make it parallel to the floor, or just add straight stock and drywall to lower it. Of course you will be taping and mudding that drywall dropped ceiling and having a matching issue with the existing ceiling. One other option would be to add a short false beam there. No drywall work at all. Add blocking to the ceiling, slip up a false beam that is bigger than the crown to make a reveal between the beam and the crown, and nail to blocking, then add the crown.

Re: crown moulding question

#4

Re: crown moulding question

Barry Irby

I think Dick and are making a similar suggestion. Install a 2x4 or 2x6 across the opening flush with the face of the wall, Paint it white, and install the crown molding. Cutting the inside corner at that compound and could be interesting. You could use the little corner blocks.

Why do your seams fail? How big are the openings? There is a phenomenon known as Truss Lift or Truss UpLift. I can go into in depth detail if you want. Its the bane of the truss industry. I the crack are hairline you can use very flexible caulking to conceal most of them. If the paper is split it can be significant cause of heat loss.

Re: crown moulding question

#5

Re: crown moulding question

Bruce, a MN Galoot

It's the truss lift that's causing the problems. On the walls closest to the eave, there's no problem. Any interior wall on the vaulted ceiling, all the seams have let loose,me here there's the most movement. And even then it's only a 1/16" or so. I understand the requirements for taping have changed since this house was built 18 years ago. We likely wouldn't have the problem with the new stuff.

Thanks for your help.

Re: crown moulding question

#6

Re: crown moulding question

Barry Irby

I would try caulking them at a 1/16 or and 1/8". That is if the paper ripped. If it cam loose its harder to deal with. You can try gluing it back but that is tedious, especially if texture or popcorn is involved.

When I was building I got a bad set of trusses. They lifted 1 1/2 to 2" at the center wall. Its caused by using too much juvenile wood in the trusses. Juvenile wood can expand and contract 30 times as much length wise as mature growth wood. The problem is that the top cords are in free air and the bottom cords are buried in insulation, meaning they are operating in very different conditions. The trusses "arch their backs" in winter and sit back down in summer.

The fixes are to not use juvenile lumber in the first place and to attach the drywall to the ceiling about two feet out from the wall and then use sheetrock returned or clips on the top of the walls.

If you use crown molding attach it to the ceiling/trusses and NOT to the walls so it can telescope up and down as the seasons change.

Be aware that whatever is behind the bottom edge of the crown may be exposed if the trusses lift. I have seen a room that was papered when the trusses were down and there was a half inch of wall in some places that was bare when they rose.