A little clock progress
Joe in a Cleveland suburb
Worked on my clock some this weekend. Close to being done.
Pretty much just need to make\install the back and install the doors.
Oh, need to make a couple knobs too for the doors.
Thanks for looking.
The bottom door panel. Finished with shellac, rubbed out, ready for glue up
Getting ready to glue up the bottom door
The backside of the bottom door
Case being rubbed out
The case
Installing the top and bottom. Just screwed into place
Top and bottom installed

How about one in color though, I'm curious to see the finish color you used on the maple.


