Doors with glass
Joe in a Cleveland suburb
In the July/August 2002 issue of FWW, C. Becksvoort has an article on the Shaker Wall clock.
Can anybody explain to me how the upper (and lower door joinery) is done? I don't get it.
In the text he states using haunched tenons, but the picture/diagram doesn't look like it to me.
The article doesn't go into any details on the joinery.
Also, the upper door shows a rabbet for the glass. Would the rabbet be cut before doing the mortise and tenons?
I'm struggling with this step of making my clock. I've made M/T'd cabinet doors before, but never with rabbets to hold glass.
I can't get my head around how I should do the joinery for the top door (mostly). The rabbet is really confusing me(!).
If you cut a rabbet in the rails and stiles, then aren't you left with a gap?
Or, is that filled in with the glass support strips that get tacked into place. That doesn't really seem to make sense either. That would mean on the stiles, the strip is the full length of the stile which would look silly.
See, I'm confused.
Thanks for any advice.
I know nothing of the publishing biz or writing articles, but I am guessing the published article is not exactly how Mr. Becksvoort wrote it.


