OT: New switch wiring requirement?
Bill Howatt
Last night I saw on Ask This Old House a segment on lighting a basement with one switch. That wasn't a big deal but the discussion in the shop after the job indicated that all new construction switch wiring required the hot to come into the switch's box first and then go to the fixture(s). The other method of putting the hot into the octagon ceiling box and then running a white/black to a switch was not allowed in new construction.
The justification for the change was that a lot of new electronic switch gizmos, such as timers, require both a hot and a neutral at the switch location.
Any comments? Is/has that been in effect long? Up here north of the border it doesn't seem to be a rule or known about.
Thanks,
Bill