I have a contractor installing AZEK decking. On the deck he left 1/4" spaces between the boards. There is a staircase leading up to the deck. The stair risers are cut from 2x12's and have 2, AZEK boards for each step. He did not leave any spaces between these tread boards. It is 40 degrees outside now. When it gets to be 100 degrees, and the boards expand, will they rip the risers apart?
First, Keith is correct about the terminology. The pieces with the triangles cut out to sport the steps are stringers. I have heard them called 'horses". The vertical piece under the nose of the treads are risers.
I think your lack of spacing is OK but it might have been good to have some for drainage. Wouldn't want the treads to pool water and freeze causing a slippery situation.
A couple of other questions. How far apart are the stringers? (what you called risers) If the AZEK is only an inch thick or less they should be only a foot or so apart, not the more typical 16 or 18" used for "2 by" treads.
And, do you have open or closed stairs? That is, do you have risers under the front nose of the treads? Locally, and I think nationally, the code requires the space between the top of one tread and the bottom of the one above to be less than four inches so that a child could not slip through. Most stairs are higher than that and therefore should be "closed" with a riser. And the riser could provide excellent support for the tread above.
I have only worked with AZEK one one job a few years ago. As I recall it is a high density waterproof wood fiber product, something like Masonite, but denser with better glue. I used for trim on a house and thought it was excellent in that application, but I wonder about its wear resistance on steps. Can't imagine that the front edges are not going to wear and crumble away over time. I have no evidence but my gut feeling is this is not the product for that spot.
The treads are 4' wide and overhang the side stringers 1" on each side. That makes the unsupported sections 13.3". Does this 13.3" violate any AZEC factory recommendations that I can show to my contractor?
Ralph, I was discussing the wrong product. My apologies, I was thinking of Miratek or some such thing. That's the wood composite one, but yours is PVC. I still wonder about the leading edge on the steps.
They only allow a 9" span for stair treads or stringers on 11" centers. There is an "unless supported" note and them they can have a 24" span. I think in your case the front board would be supported if you have a riser, but the back board would not be supported. I would ask for an additional stringer.
We have Azek on one of our decks and like it... I did add extra joists since it does become more flexible as the temps go up... The Azek surface feels great with bare feet