Now that my shop is heated and has A/C my thoughts are on finishing projects.
What are will give the best results in regards to temperatures and Humidity levels and swings from high to low in a give time during application up until the piece goes out the door?
In terms of relative humidity - my dehumidifier is set for 65%. I find this keeps the rust reasonably at bay and works reasonably well for most finishes. Of course as soon as I apply a finish, I vent the shop - but the initial start is always at 65%.
As far as temperature - I'd say anywhere from 60-80 degrees F is good.
If your shop has been cold, you can warm the air quickly, but the air inside the wood, if it is colder, will be slower to warm, then expand. This slower expansion inside the wood will cause bubbles in slower-cure film finishes.
It is better to have the wood warmer on the front end.
Oil based and waterborne finishes are almost always formulated to be applied at 65-70 degrees and 50% relative humidity. At lower temperatures and higher relative humidities the curing time will be longer. Solvent lacquer and shellac canbeapplied at almost any temperature. These two finishes use evaporative solvents that evaporate at any temperature and humidity.