I have done a lot of floors in my day but we used cut nails with a power driver (Manual). I always let the boards sit for about a week maybe two before installing if they were banded. It all depends where the flooring came from and how it was stored. I have had boards spring out of a bundle 4" off the center so if they are banded leave them that way until you are ready to nail them. Also use 15lb felt as a underlayment. Another net trick I learned about 40 years ago was to put down baby powder, it will keep the new floor from squeaking until its settled in.
Excellent Advice so far. I would second Richards advice about screwing down the subfloor. Locally, if the subfloor were 3/4 it might have been T&G and glued and if its glued to the joists it might be very secure and not squeak, but any plywood not glued should be screwed down. Use lots of screws.
You can go to the National Oak Flooring Manurfacturers Association website (NOFMA) and down load their manual on installing flooring. There is also another site for hardwood flooring in general. Both are good and have very similar guides. The manual is a tough read, but actually packed with good info.
I hope you are using an air actuated nailer. they are wonderful compared to the old manual models. I have used both and the air version is much more user friendly. I always had the sensation that I was trying to drive my kneecap down to my ankle with that huge hammer.
Get somebody to "rack" or layout the flooring for the person nailing. That person really helps to control the pattern of the end joints. Pay attention to the pattern and don't let joints too close together creep in. You should be monitoring three or four rows for repeats. Use plenty of nails, one about every ten inches and about three inches form the ends. Not too close to the ends, it will split. That big rubber end on the hammer is amazing for driving them up close. Don't hesitate to discard one that won't drive home.
And what Bob said is very true. Let the bundles acclimate in your house for two weeks or more. One last thought, the industry says the installer is the final quality control person. Allow five percent for selection and throw out any pieces that don't look perfect. You can put marginal pieces in closets or places that are not very visible. (don't put that one ugly blackened piece right in the middle of the foyer floor.)
Be prepared for an ailing back. After working all day or for days bent over you might need a massage.
You've gotten great advice. I also screwed the underlying 3/4-inch T&G plywood, stapled resin paper to the plywood, and used a manual nailer. I don't remember what the length of nail was, but it was the standard length IIRC. Barry's suggestion to have a second person laying out the boards really speeds things up. I found a large screwdriver was helpful to gently pry a few recalcitrant boards into place. To avoid splitting the tongue on a hard wood like locust, I thinly-coated the strip of nails with the "wax" from a toilet bowl seal, but paraffin would likely work as well. I used this trick on other woods as well.
As I was laying random planks 3-6-inches wide, I chose to screw and plug the wider boards as well.
At the time, I read Bollinger's book and found it extremely helpful. I guess some consider it a bit dated now, but it has a lot of good info.
I found laying down hardwood floors to be very rewarding and a real fun DIYer project. The sanding, not so much fun. Finishing was like building furniture; it looks dull until the finish goes on, then WOW, it was all worth it.
I have done floor with those nailers and they are arm killers!! The last # of floors I have used a Pnuematic FLoor Stapler(Bostwick,I think) from the local tool rental. This is also what the pros use in our area. Will save you arm.
I like the manual nailers. I can control the whack that sets the nail, modest if the strip is pulled up and sturdy if it needs to be pulled up a bit. If you let the weight of the hammer do the work I don't find using one tiring.
Due to heating and cooling seasons, it isn't just a matter of acclimating the flooring to your existing conditions today. You want to assure that you are below the worst dryness of the house for all seasons. Your flooring will survive a fair amount of expansion without showing negative signs, but it cannot experience very much contraction without becoming immediately evident.
Stack your wood in a heated room and let the temperature go above normal to help dry the wood more before laying it. If you have a small room, like a bathroom, stack the wood in there, open the heat vent and close the door.
You may hear that relative humidity doesn't change very much with seasons, but that is relating to outdoor ambient air. The air inside your house does change significantly because it is taking this outdoor air with its given absolute moisture content and changing the temperature, which changes the relative moisture content.
If you lay your floor dry, you won't have to putty any cracks because there won't be any. The amount of expansion is minimal, and well within the holding power of your fasteners.
Many years ago (early 60's) I laid my house floors, all but kitchen & bath were unfinished Oak laid on 1 X 12 diagonal pine sub floor. At the advice of the Old retired Pattern maker / Carpenter that helped me build the house I used Red rosin paper under the Oak. He said it would never squeak using that. The house went when I had a divorce so can't really say how long it worked but never had any issues while I lived there.
I agree. I used the Porta-Nailer manual nailer (with 2-inch nails) that comes with a quite heavy cushioned hammer. I just raised the hammer over my head and let drop with very little added force and the nail was driven in just fine. Kinda cathartic in a way .
You will need to face nail the last two or three rows. Either drill and nail them with finishing nails or use a air finishing nailer.
Several people have mentioned Red Rosin paper or tar paper/felt.
The principle purpose for them is to stop air infiltration. They are excellent over board subfloor, but unnecessary (or less important) over plywood. Floors squeak because something moves. Edges sliding on each other or sliding on the shank of the nails. If the paper cushions the floor and allows it to move it may not be good. Also, do your cutting in another room and keep the sawdust and any other debris out from under the flooring. It should be very clean.