Bow front progress
Bill Tindall
Finally got all the drawers done including a redo of #9 which somehow came out exactly 1" too deep on the first try. #9 has an English style "slip" to provide more bearing surface for this large drawer. I like to keep the sides 1/2" or less as I think it looks better and makes for a lighter drawer.
The drawers in rows 4&5 remain to be cock beaded. One can see the relief for the bead as an 1/8" gap around these drawers. Cock beading the bow front is especially time consuming for there is much hand fitting of the parts. There is a staggering amount of labor in these 9 drawers.
I still need to make and fit some drawer bottoms as well as the back and fit the skirt. Then on to finishing which will be burnt umber stain, and a top coat to be decided. I was pleased with the warmth of the varnish I put on the last chest of drawers and that may be the fate of this one.



