Stuart Johnson
After remodeling we had to upgrade our heating and air conditioning. I saved both the furnace and outside compressor unit to eventually install in my shop. The shop is a 1200 sq. foot metal building with 12 foot ceilings, semi insulated at this point. I'm comfortable working in 60 degrees. I'm thinking about just building a stand for the furnace with a box to hold an air input filter and allowing the blower to blow into the shop and not use ducts or a thermostat. Once the shop is comfortable I'll just turn it off. This is an electric unit and I do anticipate the need to blow the dust off it on a regular basis. This is temporary until I finish the walls and will be plugged rather than hard wired until then.
The big question are there any serious reasons why this is a bad idea?