I have a deck that has 2x8 joists 16" o.c. . The joists are 8' long and supported by joist hangers into a ledger board lagged into the house on one side and a double 2x8 rim joist on the other end.
I want to get a hot tub that ha a footprint of approx 7'x8' and weighs about 4700lbs when filled with water and people.
My question is can this deck as constructed safely support this load?
What is the condition of the ledger board and what it's lagged into?
What is the condition of all the fasteners involved?
Recent years have seen some very large jumps in the standards for decks due to the highly-publicized catastrophic failures. A brand new deck built to the codes of 10 years ago was pretty good--but decks deteriorate in invisible ways in pretty short order. Then along came the treated wood reformulations that ate non-stainless fasteners for breakfast. The number of lag bolts required has basically doubled.
Not to mention, you're looking at an 84 p.s.f. load that you're adding to the deck. Most interior floors aren't built to hold that, and decks are built to a lower load limit usually.
I'd probably add 2-4 2x12s centered under the hot tub, perpendicular to existing joists, attached to 2 additional posts under the tub. I'd put the 2x12s on either side of the posts (either one on each side, or two on each side), and through-bolt them, with the posts anchored to concrete piers that go below the frost line. I'd also cross-brace the posts to each other and to existing posts.
The deck was built somewhere between 2001 and 2003 and looks to be in good shape. The joists are redwood not PT. and the fastners look good. I'm not sure how many lag bolts/ft there are. The house is 2200 miles away but I'll be there in a couple of days and check.
The ledger board is lagged into the rim joist. I understand your beam suggestion but the area below the deck is all ledge and I'm not sure how to get the "new" posts into the rock.
If you are going down onto rock, there is no need to excavate, you can set it right on top. There are some fasteners which are made to secure the post and get it up, which may help then ends dry faster if this is in a very wet area.
I would do the drop-girder too, but rather than just bolt them to each side of the new post, I would notch the top of the post, so that the bottom edges are resting on end-grain of the post, rather than resting on the bolts.
Frank , without seeing it , this is only a suggestion, but the way I would go.
Ordinarily if your joists were Doug Fir , there would be no question about their ability to carry the load , given the size of the joists and the span.
Redwood is not rated for horizontal loads, but on the other hand a very good wood to have close to the grade.
I would check the lagging of the ledger and make sure you have at least least a staggered lag bolt every two feet .
I would also run a Redwood or PT 2x4 below the ledger to the grade or foundation footing.
Redwood gets much stiffer when it is seasoned and bone dry , but it wouldn't hurt and you may need additional support directly under the Tub .
I would use a Doug Fir or Yellow pine 4x6 supported by posts that land on precast piers that have been set in a mortar mix right on the rock ledge.
The Mortar mix comes in a sack and allows you to level the pier and bond it to the rock that you already have cleaned and soaked with water.
The girder needs only to be as long as is necessary to span the distance under the Tub.
Once the Girder is in , toe nail it to the joists and your done.
I will check the ledger when I get to the house. It is not in a wet environment, its in Colorado.
Are you saying that I can mortar a precast pier right to the Rock? I didn't think of that.
I need to take a good look at the setup once I get out there.
An engineer friend suggested that the biggest issue is probably the ledger attached to the house, and if that's OK the I should probably add a few additional joists under the tub area so that the joists there are 8" OC.
Are you saying that I can mortar a precast pier right to the Rock? I didn't think of that.
Yes , since your on a surface that can't be surfaced flat or even , Mortar does the trick and in addition forms a bond between the Pier and rock.
I run into a couple of house building projects around Mt. Diablo in Ca and the terrain was rock , the building department after a little argument was fine with forming and pouring the foundation on the rock as opposed to trenching a footing which was prohibitively expensive