OT - a workshop framing question
Bill Houghton, Sebastopol, CA
I'm converting a shed I built some years back into a workshop with finished walls. Simple gable roof. Cathedral ceiling (my sweetie finally gets a space with a cathedral ceiling), with 3" of sheet foam insulation in a 2x6 rafter bay and 2-1/2" of ventilation space above the foam; each rafter bay will be ventilated at the soffit, with a ridge vent on top.
The rake walls are built on top of standard double-top-plate walls. At the moment, there's no barrier between the rake wall cavities and the adjacent ceiling cavity. Is it necessary/desirable/code to install 2x stock in a manner that isolates the rake wall cavities from the ceiling cavity?